09/03/2026
The Navy just removed one of the biggest barriers holding back additive manufacturing in the submarine enterprise.
New requirements released this month clear the path for metallic 3D printing to scale across submarine construction, maintenance, and repair. Fewer approvals. Faster fielding. No compromise on quality.
At Fairbanks Morse Defense, that's not a future goal — it's a completed project.
Through Hunt Valve Company, Inc., we delivered a WAAM-built Cyclone Separator Assembly for the US Navy: production-intent quantity, LEVEL I classification, and full GCQA oversight. The same high standards. A faster path to the fleet.
Speed and quality aren't a trade-off. They're the mission.
Read the Navy announcement: https://www.navy.mil/Press-Office/Press-Releases/display-pressreleases/Article/4580193/navy-removes-bureaucratic-barriers-to-accelerate-3d-printing-and-accelerate-sub/
WASHINGTON, Aug. 21, 2026 — In a decisive move to accelerate warfighting capability and eliminate industrial bottlenecks, the Navy released new technical requirements on August 11 designed to rapidly