Lubisi Consulting

Directions Website

Lubisi Consulting Lubisi Consulting is a professional consulting engineering firm.

When the power goes, the sewage doesn't stop.Sewer pumpstations rely on electricity to keep sewage moving. When the grid...
02/11/2026

When the power goes, the sewage doesn't stop.

Sewer pumpstations rely on electricity to keep sewage moving. When the grid fails, the pumps stop, but the flow continues. Without backup power, that can quickly lead to overflows, environmental damage and public health risks.

That's why standby generators matter.

As part of the Taljaard Sewer Pumpstations upgrade, we included standby power at key pumpstations to keep the system operating until grid power is restored.

Sometimes, a relatively small piece of infrastructure prevents a very big failure.
What's a piece of 'invisible' engineering you'd like us to explain next? Tell us in the comments.

Want to find out more? www.lubisi.co.za




Ruptured pipes. Failing pumps. A sewer network stretched to its limit.That was the challenge behind the Taljaard Sewer P...
29/10/2026

Ruptured pipes. Failing pumps. A sewer network stretched to its limit.

That was the challenge behind the Taljaard Sewer Pumpstations upgrade in Standerton.

Following a technical assessment in 2023, we replaced ageing and ruptured pipelines, installed new pumps, electrical equipment and standby generators, strengthened security infrastructure and trained municipal operators.

The result? Routine spills and blockages have been eliminated, and the people responsible for running the system have the skills to keep it working.

Because infrastructure delivery doesn't end at handover. It ends when the system works and keeps working.

Work with us – www.lubisi.co.za





R13.5 billion was withheld from 69 municipalities. But the bigger question is: why did it get to this point?When Nationa...
21/10/2026

R13.5 billion was withheld from 69 municipalities.
But the bigger question is: why did it get to this point?

When National Treasury temporarily withheld equitable share transfers, the headlines focused on the number. In today's MTBPS, Minister Enoch Godongwana confirmed the action and noted that by end-July 37 of those municipalities had signed repayment plans and paid R4.2 billion to creditors, proof that the intervention forced accountability.

From where we sit, the bigger story is what financial governance means for infrastructure delivery.

Unfunded budgets, unresolved irregular expenditure and weak accountability don’t stay on spreadsheets. They become stalled projects, lapsed maintenance contracts and infrastructure that is approved, designed and costed, but never built.

Our MD, Chalmers Pagiwa, unpacks what this means for engineers working in the public sector.

Read the full op-ed on page 38 of the SAICE Civil Engineering Magazine.
https://www.flipsnack.com/BE95BDAA9F7/civil-engineering-september-2026






How do you ensure quality from the first stage to the last? Delivering reliable water infrastructure requires more than ...
12/10/2026

How do you ensure quality from the first stage to the last?
Delivering reliable water infrastructure requires more than technical expertise. It demands consistent quality management throughout every phase of design and construction.

Every stage of our projects are supported by the same rigorous quality management systems that underpin our ISO 9001:2026 certification. From an intake pumpstation to clearwater storage facilities, every milestone is completed with the same commitment to excellence.

Because quality isn't something that's checked at the end of a project. It's built into every step along the way.

Visit www.lubisi.co.za to learn more about our quality standards.



Today, our MD Chalmers Pagiwa took time to attend Consulting Engineers South Africa's Annual Golf Challenge at Randpark ...
08/10/2026

Today, our MD Chalmers Pagiwa took time to attend Consulting Engineers South Africa's Annual Golf Challenge at Randpark Golf Club.

It was a great opportunity to enjoy some friendly competition, to network and connect with colleagues, clients and industry peers.

We had a fantastic time and look forward to building on the energy, connections and conversations from today.




08/10/2026

🏗️ Before construction starts, the records must be right

Engineers are expected to design with precision but that precision depends on having reliable information about what already exists.

In his latest article, Chalmers Pagiwa, MD of Lubisi Consulting Engineers, looks at the risks created when historical records do not accurately reflect underground infrastructure.

For project teams, incomplete or inaccurate records can mean unexpected conditions during excavation, potentially leading to:

🔹 Damage to existing infrastructure
🔹 Construction delays and disruption
🔹 Additional costs and rework
🔹 Safety risks for workers and the public.

The article highlights why improving the accuracy and accessibility of infrastructure records should form part of project planning before construction begins.

Because when the information beneath a project is wrong, the consequences can surface very quickly.

đź”— Read the full article by Chalmers Pagiwa: https://infrastructurenews.co.za/2026/09/29/before-construction-starts-the-records-must-be-right/

08/10/2026

We extend our appreciation to Lubisi Consulting for renewing their annual sponsorship of our Young Professionals Forum. Your support is instrumental in our mission to grow our own timber - building a capable and resilient consulting engineering fraternity.

Become a YPF sponsor or renew your sponsorship today: https://www.cesa.co.za/ypf/young-professionals-forum/ypf-sponsors/





The Drieskoppies Water Treatment story Who makes sure every stage works exactly as it should? Behind every successful wa...
08/10/2026

The Drieskoppies Water Treatment story
Who makes sure every stage works exactly as it should?

Behind every successful water treatment works is a team of engineers committed to precision, quality and long-term performance. From designing flow rates and treatment processes to overseeing construction on site, every decision influences how effectively the plant will serve its community.

At Driekoppies Water Treatment Works, our specialists are applying their expertise throughout every stage of the project, ensuring each component performs as part of one integrated system.

It's this commitment to engineering excellence that turns complex infrastructure into dependable public services.

Visit www.lubisi.co.za to learn more about our engineering expertise.



What is the true measure of a successful water treatment plant? It's more than engineering excellence. It's the confiden...
07/10/2026

What is the true measure of a successful water treatment plant?
It's more than engineering excellence. It's the confidence that communities have access to safe, reliable water every day.

Every stage of the Driekoppies Water Treatment Works has been designed with this outcome in mind. From the first litre entering the pumpstation to the treated water leaving the clearwater tank, the entire process is focused on protecting public health, strengthening service delivery and supporting long-term community resilience.

Because when infrastructure performs as it should, communities can thrive.
Visit www.lubisi.co.za to learn more about our approach.




What does it take to transform raw water into a safe, reliable water supply? Over the past few weeks, we've taken you th...
30/09/2026

What does it take to transform raw water into a safe, reliable water supply?

Over the past few weeks, we've taken you through every stage of the Driekoppies Water Treatment Works. From the intake pumpstation and flocculation process to sedimentation, filtration and clearwater storage, each stage has one purpose: preparing water for the next step until it is ready for the communities it serves.

It's a carefully engineered system where every process depends on the one before it. By designing every stage to work seamlessly together, we're helping build resilient water infrastructure that will support reliable service delivery for years to come.

Next, we'll look beyond the process itself and explore the lasting impact this project will have on the community.

Visit our website to see the full picture of our work.




Address

20 Brander Street
Mbombela
1200

Alerts

Be the first to know and let us send you an email when Lubisi Consulting posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Nearby equipment services