LINQX Welcome to the official LINQX Facebook channel—your go‑to source for digital transformation in oil & gas.

We use AI, advanced analytics, and decades of expertise to revolutionize well construction—from design and drilling through cementing & fracture. Welcome to the official LINQX facebook—your go‑to source for digital transformation in the oil and gas industry. We leverage AI, advanced data analytics, and decades of expertise to revolutionize well construction and stimulation—from design and drilling through cementing, fracture logging, and production optimization.

📍 Heading to DUG 2026? Come see LINQX at Booth 212.From September 15–17, we’ll be at the George R. Brown Convention Cent...
09/08/2026

📍 Heading to DUG 2026? Come see LINQX at Booth 212.

From September 15–17, we’ll be at the George R. Brown Convention Center in Houston connecting with oil & gas professionals and showcasing technologies built to support better decisions across well construction and stimulation. Stop by Booth 212 to meet our team and explore what LINQX is bringing to the next generation of well operations.

📅 September 15–17, 2026
📍 George R. Brown Convention Center | Houston, TX
🔹 Booth 212

See you at DUG 2026!

Happy Labor Day from LINQX!Today, we honor the hard work, dedication, and contributions of workers across the U.S. who k...
09/04/2026

Happy Labor Day from LINQX!

Today, we honor the hard work, dedication, and contributions of workers across the U.S. who keep our communities and industries moving forward.

Wishing our customers, partners, and colleagues a safe and happy Labor Day.

How accurately can you predict cement temperature during a plug job?Temperature prediction can play an important role in...
09/02/2026

How accurately can you predict cement temperature during a plug job?

Temperature prediction can play an important role in plug cementing design, but conditions can change significantly during mud displacement and pipe pull-out.

Our latest blog explores an advanced numerical model that captures transient temperature changes across the full well depth.

Through detailed case studies, discover how pipe diameter, fluid viscosity, well inclination, pulling velocity, and placement method can affect cement temperature—and what these findings mean for optimizing plug cementing strategies.

Read the full analysis and explore the key findings 👉https://na2.hubs.ly/H07Bn5G0

Something worth joining is taking shape.The LINQX community on Collide is coming soon — a new space for our network to c...
08/26/2026

Something worth joining is taking shape.

The LINQX community on Collide is coming soon — a new space for our network to connect, share what we know, ask questions, and discover what others across oil & gas are working on.

Want to be part of it from the beginning? Join the waitlist → https://na2.hubs.ly/H07s0l00

When the community opens, you’ll be able to:

→ Exchange ideas with industry peers
→ Learn from experienced professionals
→ Share experiences and insights
→ Build meaningful connections across oil & gas

Get in early. Join the waitlist!

One day to go. ⏳What if you could see a cementing risk before it becomes NPT?Tomorrow, see how CEMPRO Live helps enginee...
08/24/2026

One day to go. ⏳

What if you could see a cementing risk before it becomes NPT?

Tomorrow, see how CEMPRO Live helps engineers monitor real-time data, spot changes early, and respond before issues escalate.

→ Real-time KPI monitoring
→ Configurable alerts
→ Faster, more informed decisions

Join us tomorrow — reserve your spot: https://na2.hubs.ly/H07nRQH0


A new way to connect across the LINQX network is taking shape.We’re building a new space on Collide for the people behin...
08/19/2026

A new way to connect across the LINQX network is taking shape.

We’re building a new space on Collide for the people behind the work — a place to connect beyond the usual meetings and events, share knowledge, ask questions, and keep conversations going across the oil & gas industry.

What is Collide?
Collide is an online community platform where professionals can connect, exchange ideas, learn from one another, and build meaningful industry relationships — all in one place.

A place to:
→ Ask questions and exchange ideas
→ Learn from experienced industry professionals
→ Join AMAs and community conversations
→ Share experiences, insights and lessons learned
→ Build meaningful connections across the oil & gas industry

We’re opening the door to this community soon, and we’d love to have you there from the beginning.

Want to be part of it? Join the waitlist and be among the first to know when the community opens.
👉 https://na2.hubs.ly/H07jgxR0

Cementing problems rarely appear all at once.A pressure change. A shift in ECD. A change in flow rate. Small signals can...
08/13/2026

Cementing problems rarely appear all at once.

A pressure change. A shift in ECD. A change in flow rate. Small signals can become bigger problems when they aren’t visible soon enough.

CEMPRO Live gives engineers a real-time view of critical cementing parameters, with simulation and automated alerts to help identify changes while the job is underway.

See how it works in our upcoming webinar:

👉 Register here:
https://na2.hubs.ly/H079M680

💡 Great conversations drive great ideas.Our team with LogistixIQ recently came together over lunch to discuss strategy, ...
08/06/2026

💡 Great conversations drive great ideas.

Our team with LogistixIQ recently came together over lunch to discuss strategy, share perspectives, and align on priorities. Bringing teams together strengthens collaboration, encourages new ideas, and helps us continue moving forward with a shared vision.

👀 What if the most important part of a cement job is the part you can't see?The critical events that determine long-term...
07/30/2026

👀 What if the most important part of a cement job is the part you can't see?

The critical events that determine long-term well integrity happen thousands of feet below the surface.

As wells become more complex and pressure windows continue to narrow, understanding downhole conditions while the job is in progress is becoming increasingly important.

In our latest blog post, we explore:

✔ Why real-time visibility matters
✔ The limitations of post-job analysis
✔ How engineering models and live operational data improve operational awareness

📖 Read the blog: https://na2.hubs.ly/H06YPNR0

Cement sheath failure in injection wells remains one of the oil and gas industry’s most costly and persistent well integrity risks. It’s not a new challenge—but it is becoming more severe. As mature fields transition into EOR programs and CO₂ storage expands, the conditions cement was origin...

Address

2050 W Sam Houston Parkway S, Suite 1750
Houston, TX
77042

Opening Hours

Monday 9am - 6pm
Tuesday 9am - 6pm
Wednesday 9am - 6pm
Thursday 9am - 6pm
Friday 9am - 6pm

Telephone

(713) 981-5558

Alerts

Be the first to know and let us send you an email when LINQX posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to LINQX:

Shortcuts

Share