05/29/2026
⭐ Project Highlights
From battery energy storage to utility-scale solar, Verdantas is helping advance critical energy infrastructure through integrated engineering solutions. ⚡
Our Power team recently supported two projects in California that reflect the range of our capabilities across transmission, substations, and renewable energy systems. One project focused on the design of a 230 kV generation tie line supporting a battery energy storage system, while the other encompassed engineering for a utility-scale solar PV and battery energy storage project, including a gen-tie, substation, and collection systems.
Each project brought its own set of challenges, from constrained alignments and seismic considerations to complex interconnection requirements and evolving design needs. Through coordinated electrical, structural, civil, and geotechnical engineering, our team delivered practical solutions that supported reliability, constructability, and long-term performance.
We’re proud to highlight the work of our Power team in delivering solutions that support a more resilient and connected energy future.
👉 Explore both projects:
🔗 Avocet Battery Energy Storage System Gen-Tie: https://www.verdantas.com/projects/avocet-battery-energy-storage-system-gen-tie
🔗 San Luis West Solar PV and Battery Energy Storage:https://www.verdantas.com/projects/san-luis-west-solar-pv-and-battery-energy-storage