10/14/2026
Phase one of our portion on this new construction build was buttoned up today on site with the posts and W14X30 beams put in to span the garage ceiling and support the upper level bedroom dormers. A huge thanks to Kevin and Matt for the logistics and coordination of this project along with Chuck Palmieri for the set of hands and endless support along with Stanley Steel Service for the driveway delivery of the goods. More to come on this project, specifically tying in the beams laterally to the walls with brackets and some basement columns. Installed in two days and we lucked out with the weather dodging the forecasted rain on site for both days.