PJR Engineering

Call Directions Website Contact the business

PJR Engineering Authorised supplier of new brick-making machinery in Africa, supported by precision steel fabrication.

Engineered solutions for scalable production and industrial growth.

𝗔 𝗺𝗮𝗰𝗵𝗶𝗻𝗲𝗿𝘆 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝘀𝘁𝗮𝗿𝘁𝘀 𝘄𝗶𝘁𝗵 𝘂𝗻𝗱𝗲𝗿𝘀𝘁𝗮𝗻𝗱𝗶𝗻𝗴 𝘁𝗵𝗲 𝗼𝗽𝗲𝗿𝗮𝘁𝗶𝗼𝗻 𝗮𝗿𝗼𝘂𝗻𝗱 𝗶𝘁.Site access, available space, plant flow and pract...
30/10/2026

𝗔 𝗺𝗮𝗰𝗵𝗶𝗻𝗲𝗿𝘆 𝗽𝗿𝗼𝗷𝗲𝗰𝘁 𝘀𝘁𝗮𝗿𝘁𝘀 𝘄𝗶𝘁𝗵 𝘂𝗻𝗱𝗲𝗿𝘀𝘁𝗮𝗻𝗱𝗶𝗻𝗴 𝘁𝗵𝗲 𝗼𝗽𝗲𝗿𝗮𝘁𝗶𝗼𝗻 𝗮𝗿𝗼𝘂𝗻𝗱 𝗶𝘁.

Site access, available space, plant flow and practical operating conditions can all influence how a brick or block production plant is configured.

That wider project context is an important part of the conversations PJR has with manufacturers before the machinery solution takes shape.

Planning a new production operation? Send PJR your production and site requirements to start the discussion.

28/10/2026

𝗔 𝗽𝗿𝗼𝗱𝘂𝗰𝘁𝗶𝗼𝗻 𝗹𝗶𝗻𝗲 𝗶𝘀 𝗺𝗼𝗿𝗲 𝘁𝗵𝗮𝗻 𝘁𝗵𝗲 𝗺𝗮𝗶𝗻 𝗺𝗮𝗰𝗵𝗶𝗻𝗲.

Finished-product handling and transfer are part of the wider plant configuration and need to support the products and production requirements of the operation.

This footage shows the line in action, where the different stages come together as part of the production process.

Planning a new brick or block production project? Send PJR your production requirements to start the discussion.

𝗣𝗿𝗼𝗱𝘂𝗰𝘁 𝗿𝗮𝗻𝗴𝗲 𝗮𝗻𝗱 𝗺𝗼𝘂𝗹𝗱 𝘀𝗲𝗹𝗲𝗰𝘁𝗶𝗼𝗻 𝗮𝗿𝗲 𝗰𝗹𝗼𝘀𝗲𝗹𝘆 𝗰𝗼𝗻𝗻𝗲𝗰𝘁𝗲𝗱.The products a plant is intended to manufacture influence mould ...
26/10/2026

𝗣𝗿𝗼𝗱𝘂𝗰𝘁 𝗿𝗮𝗻𝗴𝗲 𝗮𝗻𝗱 𝗺𝗼𝘂𝗹𝗱 𝘀𝗲𝗹𝗲𝗰𝘁𝗶𝗼𝗻 𝗮𝗿𝗲 𝗰𝗹𝗼𝘀𝗲𝗹𝘆 𝗰𝗼𝗻𝗻𝗲𝗰𝘁𝗲𝗱.

The products a plant is intended to manufacture influence mould requirements and, in turn, the machinery configuration around them.

For brick, block, paver and other concrete-product operations, this becomes an important part of defining the wider production requirement, particularly where different formats, dimensions or future product ranges are involved.

𝘛𝘩𝘦 𝘱𝘳𝘰𝘥𝘶𝘤𝘵 𝘳𝘦𝘲𝘶𝘪𝘳𝘦𝘮𝘦𝘯𝘵 𝘩𝘦𝘭𝘱𝘴 𝘴𝘩𝘢𝘱𝘦 𝘵𝘩𝘦 𝘱𝘭𝘢𝘯𝘵 𝘴𝘱𝘦𝘤𝘪𝘧𝘪𝘤𝘢𝘵𝘪𝘰𝘯.

Planning a new production operation or expanding an existing product range? 𝗗𝗶𝘀𝗰𝘂𝘀𝘀 𝘁𝗵𝗲 𝗿𝗲𝗾𝘂𝗶𝗿𝗲𝗺𝗲𝗻𝘁 𝘄𝗶𝘁𝗵 𝗣𝗝𝗥 𝗘𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴.

𝗕𝗲𝗳𝗼𝗿𝗲 𝘁𝗵𝗲 𝘀𝗶𝗴𝗻 𝗴𝗼𝗲𝘀 𝘂𝗽, 𝘁𝗵𝗲 𝘀𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗲 𝗵𝗮𝘀 𝘁𝗼 𝗯𝗲 𝗿𝗶𝗴𝗵𝘁.Billboard, pylon and signage structures need to be planned around...
22/10/2026

𝗕𝗲𝗳𝗼𝗿𝗲 𝘁𝗵𝗲 𝘀𝗶𝗴𝗻 𝗴𝗼𝗲𝘀 𝘂𝗽, 𝘁𝗵𝗲 𝘀𝘁𝗿𝘂𝗰𝘁𝘂𝗿𝗲 𝗵𝗮𝘀 𝘁𝗼 𝗯𝗲 𝗿𝗶𝗴𝗵𝘁.

Billboard, pylon and signage structures need to be planned around the application, site conditions and installation requirements.

This is where the steel behind the finished sign becomes part of the wider project.

PJR Engineering fabricates steel structures for advertising and signage applications.

Planning a new structure? Send PJR your project requirements to start the discussion.

𝗠𝗮𝗰𝗵𝗶𝗻𝗲𝗿𝘆 𝗱𝗲𝗹𝗶𝘃𝗲𝗿𝘆 𝘀𝗵𝗼𝘂𝗹𝗱 𝗻𝗼𝘁 𝗯𝗲 𝘁𝗵𝗲 𝗳𝗶𝗿𝘀𝘁 𝘁𝗶𝗺𝗲 𝘀𝗶𝘁𝗲 𝗹𝗼𝗴𝗶𝘀𝘁𝗶𝗰𝘀 𝗮𝗿𝗲 𝗰𝗼𝗻𝘀𝗶𝗱𝗲𝗿𝗲𝗱.Access, offloading, lifting and positionin...
20/10/2026

𝗠𝗮𝗰𝗵𝗶𝗻𝗲𝗿𝘆 𝗱𝗲𝗹𝗶𝘃𝗲𝗿𝘆 𝘀𝗵𝗼𝘂𝗹𝗱 𝗻𝗼𝘁 𝗯𝗲 𝘁𝗵𝗲 𝗳𝗶𝗿𝘀𝘁 𝘁𝗶𝗺𝗲 𝘀𝗶𝘁𝗲 𝗹𝗼𝗴𝗶𝘀𝘁𝗶𝗰𝘀 𝗮𝗿𝗲 𝗰𝗼𝗻𝘀𝗶𝗱𝗲𝗿𝗲𝗱.

Access, offloading, lifting and positioning all need to be planned before equipment reaches site.

For a brick or block production project, these practical details form part of the wider plant decision, alongside machinery configuration, layout and installation requirements.

Good project preparation helps create a smoother path from delivery through to installation and commissioning.

Planning a new brick or block plant? Consider how the equipment will be received, moved and positioned on site before delivery begins.

𝗠𝗼𝗿𝗲 𝗮𝘂𝘁𝗼𝗺𝗮𝘁𝗶𝗼𝗻 𝗶𝘀 𝗻𝗼𝘁 𝗮𝗹𝘄𝗮𝘆𝘀 𝘁𝗵𝗲 𝗯𝗲𝘁𝘁𝗲𝗿 𝗳𝗶𝘁. What the plant needs to produce, required capacity, labour requirements an...
19/10/2026

𝗠𝗼𝗿𝗲 𝗮𝘂𝘁𝗼𝗺𝗮𝘁𝗶𝗼𝗻 𝗶𝘀 𝗻𝗼𝘁 𝗮𝗹𝘄𝗮𝘆𝘀 𝘁𝗵𝗲 𝗯𝗲𝘁𝘁𝗲𝗿 𝗳𝗶𝘁.

What the plant needs to produce, required capacity, labour requirements and the wider production-line configuration all influence the level of automation that makes sense.

The important question is not simply how much can be automated, but 𝘄𝗵𝗮𝘁 𝗰𝗼𝗻𝗳𝗶𝗴𝘂𝗿𝗮𝘁𝗶𝗼𝗻 𝗯𝗲𝘀𝘁 𝘀𝘂𝗶𝘁𝘀 𝘁𝗵𝗲 𝗼𝗽𝗲𝗿𝗮𝘁𝗶𝗼𝗻.

Good plant decisions start with the production requirement.

Planning a new production line? Start with the production requirement before deciding on the level of automation.

The mixer should be considered as part of the wider production line.Product requirements, production targets and the mac...
08/10/2026

The mixer should be considered as part of the wider production line.

Product requirements, production targets and the machinery configuration all influence what the mixing stage needs to support.

Plant components should be selected around the job they need to do.

The machine is important. So is everything around it.Supporting equipment, material movement, product handling and plant...
07/10/2026

The machine is important. So is everything around it.

Supporting equipment, material movement, product handling and plant layout all form part of planning a brick or block production operation.

The wider plant should be considered from the beginning.

A brick or block plant is more than the main machine.Mixing, forming, handling and stacking all form part of the wider p...
06/10/2026

A brick or block plant is more than the main machine.

Mixing, forming, handling and stacking all form part of the wider production flow, and each needs to support what the plant is expected to manufacture.

Good machinery planning starts with the full line in mind.

Address

Plot 112 Misgund Eikenhof
Johannesburg
2001

Alerts

Be the first to know and let us send you an email when PJR Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to PJR Engineering:

Shortcuts

Share

Nearby equipment services