05/19/2026
Proud to see our work recognized with the National Corrugated Steel Pipe Association 2026 Connections Project of the Year award!
From engineering and fabrication to coordination and ex*****on, this project reflects the expertise, adaptability, and teamwork that made this complex interstate drainage solution a success.
🚧 What happens when changing site conditions force a major drainage redesign along an active interstate? The answer earned The NCSPA’s 2026 Connections Project of the Year award. 🏆
The MDT Wolf Creek project by TrueNorth Steel combined custom corrugated steel engineering, hydraulic precision, and long-term maintenance access into one impressive interstate drainage access solution along I-15 in Montana.
Featuring:
✔️ A 40-foot-tall access riser
✔️ Custom tee connections
✔️ Safe permanent maintenance access
✔️ Precision hydraulic alignment
✔️ Corrugated steel adaptability in the field
This project is a great example of how steel solutions can adapt when real-world conditions change fast.
Read the full project spotlight on The NCSPA website:
https://bit.ly/4eKwqvs