10/26/2026
Anthony Taylor project, We prepped the galley and aft machinery space and finished all the hot work. Today, we painted the bulkheads,deck and overhead with a coat of epoxy so we can start the electrical and carpentry work. Later, we’ll finish the floor with garage epoxy and black, white, and gray flakes.