GW Becker Inc.

GW Becker Inc. G.W. Becker Inc. Since 1980, G.W. Becker, Inc.

provides specialized expertise & long-term planning solutions for the unique challenges of maintaining critical overhead crane equipment, since 1980. has offered a full spectrum of overhead crane related products and services including: manufacturing of custom overhead cranes and components to CMAA Specifications (Class "A" through "F") or AIST Technical Report #6, assembly of packaged crane equip

ment, workstations, jibs, hoists, OSHA and maintenance inspections with preventive maintenance, field service and repair, component rebuilds, operator and maintenance training, runway surveys and inspections, engineering analysis, design engineering, modernization's, automation control and integration, and turnkey installation, as well as parts distribution. provides specialized expertise and long-term planning solutions for the unique challenges of maintaining overhead crane equipment. We have positioned our company to offer application assistance, custom design engineering and manufacturing of overhead crane products with our customer’s needs first and foremost. Our breadth of capabilities provide efficient and cost effective solutions for all overhead material handling requirements.

G.W. Becker Inc. is THE authority in crane parts.   Our comprehensive selection of replacement parts and accessories ens...
06/19/2026

G.W. Becker Inc. is THE authority in crane parts. Our comprehensive selection of replacement parts and accessories ensures peak performance of your overhead cranes. Follow this link to download our 2026 parts sheet. https://gwbcrane.com/wp-content/uploads/Parts-Line-Card-2025-2.pdf

06/15/2026

We were proud to host the students from Laurel Technical Institute Hermitage/Sharon Campus for their annual tour at G.W. Becker Inc. last week. We appreciate the opportunity to share our workplace with future professionals. The students spent time in both of our facilities, to get a closer look at our industry and our team.

G.W. Becker Inc. is proud to play a role in serving hundreds of thousands of Pittsburghers fresh water, AND to see our e...
06/12/2026

G.W. Becker Inc. is proud to play a role in serving hundreds of thousands of Pittsburghers fresh water, AND to see our engineering and products in this recent news story photo. Read the full article below:

PITTSBURGH POST-GAZETTE, SUNDAY MAY 31, 2026

"LASTING IMPACT"
By Lindsay Shachnow; Photos by Alexandra Wimley

When the Highland Reservoir Pump Station began operating just before Memorial Day, it marked the opening of Pittsburgh Water’s first new water facility in nearly two decades — and the completion of a project nearly 10 years in the making.

Seven pumps providing millions of gallons of additional water-pumping capacity per day now service roughly two-thirds of Pittsburgh Water customers, reducing the risk of service disruptions and ultimately improving water pressure, said Barry King, director of engineering and construction for Pittsburgh Water.

“We are really looking forward,” King said Wednesday outside the new pump station near North Negley Avenue and Mellon Terrace in Highland Park. “We want the infrastructure we’re building to have that same lasting impact for generations to come.”

Engineers said customers should already notice a difference when water coming from rows of bright blue pipes that line the inside of the otherwise dully colored new station reaches their sinks and showers.

The building has nearly 16,000 square feet of usable space, including a mezzanine level below the ceilings that max out at 40 feet and tower over the pumps at ground level.

Inside the electrical room, loud fans cool down the upgraded equipment, though the sound largely is muted from the outside. Engineers stressed the importance of securing the facility, particularly after Aliquippa’s water authority faced a cyber attack in 2023.

The new pumps, run by computers that serve as the “brains” of the operation, have adjustable speeds, preventing variation in water pressure, said Frank Sidari, chief operations and environmental compliance officer for Pittsburgh Water.

The other new piece is a generator behind the facility that can automatically transfer power to the pumps in the case of a power outage lasting up to two days, Sidari said. Previously, the process had been manual, requiring more time to get the pumps restarted and causing a noticeable change in water pressure. The $42 million project, which began in 2017 in a design phase and concluded with four years of construction, is part of the organization’s Water Reliability Plan, a $500 million investment in large scale water improvement projects to prepare Pittsburgh Water for the next 80 to 100 years.

The pump station project is laying the groundwork for the utility’s biggest proposed project: a complete $67 million restoration of the Clearwell — a century-old water storage facility with a 44-million-gallon basin — where water is treated with chlorine, Pittsburgh Water officials said.

That facility, which is where Allegheny River water undergoes final disinfection, is expected to be replaced by 2032.

“It really boils down to that Clearwell, the ultimate capstone that was the driving force behind all these projects,” King said. “We wanted to be able to ensure that we could replace that on our timetable and not under an emergency.”

The Clearwell is the only one facility of its kind, so the work is being done in phases to allow water to be treated elsewhere while it’s under construction.

The goal, engineers said, is to use the 125-million-gallon capacity Highland 2 reservoir where water flows down to Butler Street in Lawrenceville, feeding into the Greenfield area and up Second Avenue — as an interim Clearwell by 2029.

About 1.47 million square feet of liner sits atop the reservoir to protect the water.

“This pump station will be critical to be able to continue to maintain that drinking water supply while we take our Clearwell offline in the future,” Sidari said.

The new infrastructure also allows for other ways to access the water supply in the event of a system breakdown. For the Highland Reservoir Pump Station, that means having several backup pumps on hand.

Pittsburgh Water spokesman Julianne Pelusi said the creation of the Highland Park facility generated 470 jobs.

The effect on residents

Higher water bills that hit customers in March are in part due to the improvements being made through the multimillion-dollar project, which is also being financed through a mix of low-interest loans from the Federal Water Infrastructure Finance and Innovation Act and Pennsylvania Infrastructure Investment Authority, Pelusi said.

“We are doing everything that we can as Pittsburgh Water to be securing grants [and] low-interest loans, so that we’re able to make this possible,” she said. “[To] be able to do this ... at as low of a cost as possible to the rate payer.”

The old pump station, constructed in 1959 and taken offline in 2016, is set to be demolished next month, Pelusi said. Before the new station was up and running, water pumping operations were transferred to the temporary pump station located outside the south wall of the original station.

After the old station is taken down, she said the former site of the station at the end of Mellon Terrace will be temporarily restored by July 3. Roughly a half-million people drink the water within Pittsburgh city limits, King said, requiring a lot of planning to make sure the system continues working around-the-clock now — and in the years to come.

“It’s always an assumption that that water is going to be coming out of the tap whenever they need it,” he said. “It really does take generations to ensure that you have a system that can support [it].”

When constructing the new building on the edge of Highland Park, King said, architects also tried to limit the noise to avoid disturbing parkgoers.

Outside the building, only a faint hum can be heard.

“A silent hero,” said Pelusi, referring to the term she uses to describe the new pump station.

“But working so hard.”

National Forklift Safety Day is an opportunity to highlight the importance of awareness, training, and teamwork. Thank y...
06/09/2026

National Forklift Safety Day is an opportunity to highlight the importance of awareness, training, and teamwork. Thank you to our employees for leading by example every day. Shown, are some of our many "Forklift Safety Certified" team members here at G.W. Becker Inc.

06/09/2026

“Safety First!” Happy National Forklift Safety Day from G.W. Becker Inc., as we remind everyone to stay alert and safe while working. Today we recognize National Forklift Safety Day AND the team members who help keep our operations running smoothly. Their commitment and attention make a difference every day.

06/03/2026

Another G.W. Becker Inc. custom crane order completed, loaded, and headed out for assembly and installation.

NOW HIRING:  CNC Machine Shop Supervisor (Mazak / GibbsCAM)To get priority Interview scheduling please use the link to d...
05/27/2026

NOW HIRING: CNC Machine Shop Supervisor (Mazak / GibbsCAM)
To get priority Interview scheduling please use the link to do a quick, 6 question video interview: https://app.hireflix.com/public-application/69d7a2aa76d54c80bef32995

Why You Might Like This Job:
- 1st shift only – stable schedule (10-hour days)
- Steady overtime available (no shift changes)
- Clean shop with newer Mazak machines (Smooth G controls)
- Small team – no corporate bureaucracy
- Real input on processes, tooling, and workflow
- Mix of leadership + hands-on machining

05/27/2026

Before the end of National Photography Month (May) we wanted to showcase the “artistry” that can be found in what we do here at G.W. Becker Inc. As we manufacture cranes and crane parts, we highlight some still moments and visual perspectives like these, captured along the path toward providing the industry solutions that we have been known for, since 1980. Every day brings moments worth capturing. We’re proud of the work our team does!

“You don’t take a photograph, you make it.”
― Ansel Adams

G.W. Becker Inc. treated the entire staff to a Memorial Day picnic!  Great picnic food, beverages, and a red, white, and...
05/22/2026

G.W. Becker Inc. treated the entire staff to a Memorial Day picnic! Great picnic food, beverages, and a red, white, and blue cake were a perfect prelude to the holiday weekend. The lucky door prize winners are shown, and a terrific time was had by all, in large part due to the meal catered by Cookies, Catering & Creations.

Address

2600 Kirila Road
Hermitage, PA
16148

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

(855) 423-2537

Alerts

Be the first to know and let us send you an email when GW Becker Inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to GW Becker Inc.:

Share