13/10/2026
We installed 170 meters of continuous stainless steel handrail in the central stairwell of the ACC Building in ĹŚtepoti Dunedin. This handrail spans seamlessly across multiple floors, stairs, and landings.
This project was executed in close collaboration with the expert team at Metro Performance Glass. It combines striking visual continuity with robust safety crediting full compliance under the NZ Building Code.
Metalworks Otago is the only fabrication workshop in Dunedin equipped with a mandrel tube bender, therefore enabling the team to achieve significantly shorter turnaround times.