Ruby's Small Engineering

Ruby's Small Engineering One off pieces made to your spec. Bespoke tow hitches for your trike/bike. General alterations and 'mending' of metalworks.
(6)

09/02/2018

Morning all. Busy, busy, busy..

Annie's trike nearly done, test ride next weekend?? Exhausts done, engine runs nicely, I broke the choke cable, so new one fitted. Just hope Blu still fits his 'seat', he has filled out a bit πŸ˜ƒ

Started my trike, forks out, bearings out, New seals and oil for forks on order. At least all front end will be done, hopefully new bearings will go someway to helping the massive steering wobble, but, dampers will be required. Risers to go in too allowing me to sit more comfortably 😊

Still open for business if you need a job doing. Or, just a visit, always popping the kettle on.

18/01/2018

Been absent from here for a while. So. HAPPY NEW YEAR !
Have spent a lot of time on Annie's trike. Finishing off Blu's seat, completing the new stainless exhaust system (my own creation πŸ˜ƒ) and general tidying. Nearly there.
Electrics went pop in lean too, so had to sort that. Both portable heaters went bang and tripped the whole house out....Ooops.
So, back on it today, weather looking okay 😁

04/01/2018

Ruby's Small Engineering's cover photo

29/12/2017

My new sign. Christmas present off the wife πŸ˜„πŸ˜„πŸ˜„

21/12/2017

6 right angled, box section brackets. Client supplied the 'straight' length of box section. All done ready for collection after cutting, welding and tidying up :-)

15/12/2017

Wishing you ALL a very Happy Christmas and Prosperous New Year.
Whatever you are doing over the festive season, ENJOY
See you in 2018 πŸŽ΅πŸŽ·πŸŽΆπŸŽΊπŸ‚πŸŽΌπŸ˜„

24/11/2017

Morning all, bit of an update. Getting on we with Annie's trike.
Engine nearly done after oil pump went.
Blu's seat is also nearly done, waiting on softer springs, he's not that heavy.
Boot has been cut down to level of petrol tank and old hinge removed as totally f # . They had welded it on!!!!
Am open for any jobs that you may need doing. Please feel free to contact me.

31/10/2017

All client work done and up to date.....SO.........Back to Grannie and adaptations ready for 'Blu's seat' πŸ˜ƒπŸ˜ƒ

16/10/2017

Well..busy I have been.
Trike number one has been sorted and returned to its owner, who is as happy as can be.
Trike number two was ridden, after being towed here, home to Southampton. The owner reckoned he went all the way grinning like a Cheshire cat.
Now back to sorting Annie's out and get Blu's 'seat' sorted out.
Then sort mine out, in between being chief cook and bottle washer, because Annie is in plaster till mid November with a fractured wrist 😳

13/09/2017

Not been on here for a while. Really been busy, oil pump on Annie's trike went, clients trike building and fitting tow bar.
Oil pump out, found new one, New filter and proper old style oil found. Just need to put it all back together. Also whilst off road, have changed handlebar mounting to hopefully make it easier to turn at stop or low speed.
Clients tow bar at fabrication stage. He was hoping it would be ready for Dubs of Anarchy, unfortunately I am not hopeful. Weather has been against me and materials not arriving quick enough.
In between times helping another client adapt a Goldwing trike rear end to fit a BMW bike front. Making up spacers and inserts for him.

So as we are away for the weekend, best get back to it πŸ˜ƒ

14/08/2017

No interuptions from dogs today. So, so long as rain holds off, clients trike will be finished. Well in time for our weekend at Wheels of Steel :-) :-)

11/08/2017

Right. Have trike to sort out by next Thursday for a client. Also need some more test riding on mine, ready for first proper trip next Friday to Wheels of Steel in Cirencester. So best get to it and let Badger n Blu play fight all day πŸ˜€πŸ˜€

06/08/2017

Had a busy week. Brakes all done on my trike. Test ride today if weather holds. Viewed a job on another trike yesterday....told him .."you can do that" So he's going to do it and if needs be I will assist. Went out last night and now recovering :-) :-)

29/05/2017

Worth all the hard work I think.
New mudguards.
New lights on rear.
Handbrake 're mounted.
New battery box made and mounted.
Frame cut down.
Seat altered to suit, thank you Cobra Leathers
One very happy Trike owner πŸ˜ƒ

07/05/2017

Nearly forgot....also made a proper breather n filter for diff and fitted.. you can just see it poking up behind right hand light πŸ˜€

07/05/2017

Lights were held on with gaffa tape after re-wire just to get trike here. Brackets and holders turned up and fitted. Shiney bits galore :-) :-)

10/04/2017

it works perfectly.

09/04/2017

Cobra Leathers needed a 1" dye set for eyelets. So Annie's wish, was my command. 😁 All she has to do now is wield the hammer 😁😁

21/03/2017

Kerrie, this is it πŸ˜„

19/02/2017

Thanks to my wonderful wife, my paperwork, all 10 months of it is now all up to date and filed... xx

10/02/2017

Client bought new indicators for his bike. Too small for original fittings. So, stainless steel inserts made and indicators fitted. Small button head screws used as a retainer, not really needed, as inserts are a press fit, belt n braces as always. Jobs a good un πŸ˜€πŸ˜€

05/02/2017

Extension brackets made for hand guards, now fitted, one adjustment to do, spacer needed to level them up, but only a little one πŸ˜€ Customer very happy πŸ˜ƒ

02/02/2017

One pair of hand guards. Brackets were too short. Made extensions and polished up from raw stainless flat bar. Customer wanted shiny, she has got shiny πŸ˜€πŸ˜€

17/10/2016

Woohoo.......Blue trike at Lucknows ready for tweaking and MOT πŸ˜€πŸ˜€

15/10/2016

Trike brakes work.....Woohoo.....calling Mark Monday...strike while the irons hot n all that πŸ˜€πŸ˜€

15/10/2016

My little project works πŸ˜„πŸ˜„ No more overflowing recycling box. A must have if the wife drinks Carling, them cans are tough πŸ˜„πŸ˜„

06/10/2016

The beginnings of my next little project πŸ˜€πŸ˜€. Any thoughts??

06/09/2016

Ians idea, Claire designed it, I printed n laminated it then Ian fitted it into what was the fixed tax holder on blue trike. Loving it

27/07/2016

The old and the new on tow bar mount for a land rover.
New framework fabricated and welded into place, with new, hand turned and threaded, boss mounting points.
Stronger and more secure than original mounting.
*Just been informed it is a Tomb Raider Land Rover and it is number 36 of 250 πŸ˜€

21/07/2016

Tony, did that adaptation I did on that master cylinder push rod work? Never heard back from you, so I assumed it did πŸ˜€

17/07/2016

New brake pedal set into plumbers blocks. New spacers and seating on the rear part of brake rod. One happy wife. Grannie now stops πŸ˜€πŸ˜€

16/07/2016

New spacers made and fitted for a quick release luggage system after one got lost.

16/07/2016

Trike is rigid. When travelling with no passenger, seat and rack bounce and rattle!! So manufactured a stay. When no passenger, bolt in top hole to keep everything rigid. When carrying a passenger, bolt in bottom hole which allows full up/down movement of stay rod. John is so pleased, he now just needs to get the paint brush out πŸ˜€

14/07/2016

New suspension for rear seat all done. Just one other little job to do and it can go back to its owner on Saturday. πŸ˜€

28/06/2016

Excited......my new hydraulic lift table/cart. Just used it to move an auto gearbox. It was just so, so easy 😁

28/06/2016

Workshop porch completed, thanks to Taff for help with panel fitting.

22/06/2016

The start of the workshop porch. πŸ˜ƒ

19/06/2016

Well, an update. The major tidy up is going well. In between trips to the tip, I have done a few little jobs on the wife's Trike, and our 'Stretch Teardrop' as dubbed by a friend. However I am open for business ready and waiting.

04/06/2016

There were 3 brilliant reviews on this page, Facebook! What have you done with them? 😈

Address

30 Alvescot Road, Old Walcot
Swindon
SN3 1BL

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 9am - 5pm
Sunday 9am - 5pm

Telephone

07703398455

Website

Alerts

Be the first to know and let us send you an email when Ruby's Small Engineering posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share


Other Engineering Services in Swindon

Show All