IME Group

Directions Website

IME Group Powering UK's waste-to-energy for 60+ years. We're your one-stop solution for industry excellence.

Six weeks for a new Archimedes screw? It doesn't have to be.Most of that lead time is queues and shipping, not fabricati...
28/10/2026

Six weeks for a new Archimedes screw? It doesn't have to be.

Most of that lead time is queues and shipping, not fabrication. At IME Fabrication we measure, draw, fabricate and fit screws from our own workshop in Essex, so your plant gets back running sooner.

Our latest blog explains how screws are made and how to cut the wait.
Read it here: https://www.imegroup.co.uk/blogs/archimedes-screw-manufacture-lead-times

🔵 Specifying a globe valve for a steam or drain system? It's more involved than it looks.Get the pressure-temperature ra...
26/08/2026

🔵 Specifying a globe valve for a steam or drain system? It's more involved than it looks.

Get the pressure-temperature rating wrong, choose the wrong trim, or mismatch the end connections — and you're looking at premature failure or a safety risk on a high-pressure system.

We've put together a straightforward guide to help engineers and plant managers get the specification right 👇

https://www.imegroup.co.uk/blogs/choosing-right-globe-valve-high-pressure-steam-drain

🏭 Your engineering supplier choice could be costing you more than you think.When plant goes down, the clock starts immed...
19/08/2026

🏭 Your engineering supplier choice could be costing you more than you think.

When plant goes down, the clock starts immediately. How quickly your supplier responds, diagnoses the problem, and gets you back online has a direct impact on your bottom line.

We've put together a practical guide on what separates a reliable industrial engineering supplier from one that leaves you waiting 👇

https://www.imegroup.co.uk/blogs/reduce-plant-downtime-choosing-right-engineering-supplier

🏗️ Two contractors, one job. What could go wrong?Quite a lot, as it turns out.When fabrication and installation are spli...
05/08/2026

🏗️ Two contractors, one job. What could go wrong?

Quite a lot, as it turns out.

When fabrication and installation are split between different companies, you get duplicated costs, blurred accountability, and disputes about whose problem it is when something doesn't fit.

We've written about why keeping both scopes with one contractor saves time, money, and a lot of headaches 👇

https://www.imegroup.co.uk/blogs/fabrication-and-installation-same-company-benefits

🔧 When it comes to turbine pipework, there's no room for close enough.High pressures, extreme temperatures, thermal expa...
29/07/2026

🔧 When it comes to turbine pipework, there's no room for close enough.

High pressures, extreme temperatures, thermal expansion, vibration — the demands on turbine pipework are intense, and the consequences of poor fabrication or installation are serious.

We've broken down exactly why precision matters at every stage, from the workshop to commissioning 👇

https://www.imegroup.co.uk/blogs/turbine-pipework-fabrication-installation-precision

⚙️ Is your grab running on borrowed time?Reactive maintenance might feel like the cheaper option — until something fails...
22/07/2026

⚙️ Is your grab running on borrowed time?

Reactive maintenance might feel like the cheaper option — until something fails mid-shift and the whole operation stops.

We've written a guide on how preventative grab maintenance reduces unplanned downtime, extends equipment life, and actually saves money in the long run.

Worth a read if you're responsible for keeping plant running 👇

https://www.imegroup.co.uk/blogs/preventative-grab-maintenance-reduces-downtime

𝘞𝘩𝘦𝘯 𝘵𝘪𝘮𝘦-𝘤𝘳𝘪𝘵𝘪𝘤𝘢𝘭 𝘮𝘦𝘤𝘩𝘢𝘯𝘪𝘤𝘢𝘭 𝘧𝘢𝘪𝘭𝘶𝘳𝘦 𝘵𝘩𝘳𝘦𝘢𝘵𝘦𝘯𝘦𝘥 𝘰𝘱𝘦𝘳𝘢𝘵𝘪𝘰𝘯𝘴, 𝘰𝘶𝘳 𝘵𝘦𝘢𝘮 𝘥𝘦𝘭𝘪𝘷𝘦𝘳𝘦𝘥 𝘢 𝘧𝘢𝘴𝘵, 𝘦𝘯𝘨𝘪𝘯𝘦𝘦𝘳𝘦𝘥 𝘴𝘰𝘭𝘶𝘵𝘪𝘰𝘯🛠𝗖𝗮𝘀𝗲 𝗦𝘁𝘂𝗱𝘆: ...
26/02/2026

𝘞𝘩𝘦𝘯 𝘵𝘪𝘮𝘦-𝘤𝘳𝘪𝘵𝘪𝘤𝘢𝘭 𝘮𝘦𝘤𝘩𝘢𝘯𝘪𝘤𝘢𝘭 𝘧𝘢𝘪𝘭𝘶𝘳𝘦 𝘵𝘩𝘳𝘦𝘢𝘵𝘦𝘯𝘦𝘥 𝘰𝘱𝘦𝘳𝘢𝘵𝘪𝘰𝘯𝘴, 𝘰𝘶𝘳 𝘵𝘦𝘢𝘮 𝘥𝘦𝘭𝘪𝘷𝘦𝘳𝘦𝘥 𝘢 𝘧𝘢𝘴𝘵, 𝘦𝘯𝘨𝘪𝘯𝘦𝘦𝘳𝘦𝘥 𝘴𝘰𝘭𝘶𝘵𝘪𝘰𝘯🛠

𝗖𝗮𝘀𝗲 𝗦𝘁𝘂𝗱𝘆: 𝗘𝗺𝗲𝗿𝗴𝗲𝗻𝗰𝘆 𝗥𝗲𝗽𝗮𝗶𝗿 𝗮𝗻𝗱 𝗙𝗮𝗯𝗿𝗶𝗰𝗮𝘁𝗶𝗼𝗻 𝗼𝗳 𝗣𝗦𝗧𝟲 𝗥𝗲𝗮𝗿 𝗪𝗵𝗲𝗲𝗹 𝗕𝗲𝗮𝗿𝗶𝗻𝗴 𝗛𝘂𝗯 𝗔𝘀𝘀𝗲𝗺𝗯𝗹𝘆

An urgent repair was undertaken on the PST6 rear wheel bearing hub assembly and its associated stand following the identification of significant mechanical damage. Components were collected from site and transported to our workshop for detailed inspection and assessment.

Initial examination revealed that the existing bearings and hub assembly were severely damaged. To restore functionality, the hub was internally bored, machined oversize, and precision-sleeved to reinstate the correct dimensions required for the stand. New, standard double-width SKF bearings were sourced and installed to ensure reliability and long-term performance.

Further assessment determined that the original shaft stand was beyond economic repair due to excessive damage at the hub end. As a result, a replacement stand was manufactured in-house using laser-cut components and MIG welding techniques. A new shaft was also precision-machined and supplied to the fabrication team for integration into the new assembly.

Upon completion of fabrication and welding, the finished component was thoroughly cleaned and protected with a coat of red oxide primer, ready for service reinstatement.

𝘔𝘰𝘳𝘦 𝘱𝘳𝘰𝘫𝘦𝘤𝘵𝘴 𝘭𝘪𝘬𝘦 𝘵𝘩𝘪𝘴 𝘤𝘰𝘮𝘪𝘯𝘨 𝘴𝘰𝘰𝘯 — 𝘴𝘵𝘢𝘺 𝘵𝘶𝘯𝘦𝘥!

🎄✨ Wishing all of our customers, supporters, and friends a very Merry Christmas and a happy, healthy, and prosperous 202...
22/12/2025

🎄✨ Wishing all of our customers, supporters, and friends a very Merry Christmas and a happy, healthy, and prosperous 2026.

Thank you for your continued support. Enjoy the festive season and best wishes for the year ahead! 🎅🎁

Address

Unit 30, Wash Road, Hutton Ind Estate
Brentwood
CM131TB

Opening Hours

Monday 7am - 4pm
Tuesday 7am - 4pm
Wednesday 7am - 4pm
Thursday 7am - 4pm
Friday 7am - 4pm

Alerts

Be the first to know and let us send you an email when IME Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share

Nearby equipment services