21/05/2026
Working in live fuel environments means there’s no room for guesswork.
Towards the end of last year, the Pro-Torque team delivered canopy repair works at a client depot in Alice Springs, managing the project from early planning and permits right through to final reinstatement.
The canopy structure above the fuel bowser area was carefully removed by crane and relocated away from live infrastructure, allowing extensive structural repairs to be completed safely on the ground before being lifted back into place.
Behind a job like this is a lot of coordination, engineering reviews, safety systems, inspections and planning to make sure every stage runs the way it should.
And that’s where our team thrives.
Practical problem solving.
Clear communication.
And projects delivered properly from start to finish.
A great result for everyone involved, with positive feedback from BP HSE for the planning and ex*****on of the works.