06/08/2026
Another contractor has increased their order... and there’s a reason why!
When you’re building spoon drains, every metre changes.
Different batters. Different grades. Constant curves.
Traditional formwork systems struggle to keep up, forcing crews to cut, pack, adjust and rebuild just to maintain the correct profile.
That’s exactly why Next Civil has increased their order of EdgePro FlexEdge 600 Brackets and FixEdge Ground Screws for the Kogan Creek Power Station spoon drain works for CMC.
The FlexEdge 600 is designed to adjust with the changing geometry of civil projects, allowing crews to:
✅ Form smooth, consistent curves with ease.
✅ Adjust to changing slopes and batters in seconds.
✅ Strip and reinstall the system quickly as work progresses.
✅ Reduce labour, minimise waste and keep production moving.
When productivity matters, having a formwork system that adapts to the job—not the other way around—makes all the difference.
A huge thank you to Next Civil for their continued support. We look forward to seeing another quality project completed with the EdgePro system.
Built for Civil. Built for Speed. Built to Last.