18/06/2026
π§ WATCH THIS SPACEβ¦ SERITI PROJECT IN PROGRESS π§
Jabulani Mining & Water Solutions, in collaboration with Aquatronics CC and F&K Hire, is proud to be part of a major water infrastructure project at Seriti.
This project includes the installation of 2 Γ 22 kW borehole pumps on Boreline pipe, complete with electrical panels to suit the application.
The scope also includes the drilling of 5 additional boreholes, strengthening the long-term water supply infrastructure on site.
Big machines. Big teamwork. Big water solutions.
A powerful collaboration between:
πΉ Jabulani Mining & Water Solutions
πΉ Aquatronics CC
πΉ F&K Hire
Delivering dependable mining water infrastructure on site.