27/05/2026
PROJECT UPDATE | BATCH 2 OF 3 – AFRICAN MINING HVAC INSTALLATION
Dueltron DEPS is currently progressing with Batch 2 of 3 for a large-scale industrial HVAC and ventilation installation at an African diamond recovery plant.
This project includes:
- Industrial HVAC ducting systems
- Structural steel support fabrication
- High-capacity airflow systems
- Environmental cooling infrastructure
- Industrial ventilation integration
Designed for demanding mining environments, this system is engineered to improve airflow control, equipment reliability, operational efficiency, and environmental stability throughout the facility.
Our DEPS installation teams continue with elevated ducting installations, structural integration, and ventilation system assembly on site as the project moves toward the next phase.
DSI continues delivering industrial automation, dust extraction, HVAC, and environmental engineering solutions throughout Africa.
🌐 www.dueltron.co.za