Roofing Accessories:
We are manufacturers of steel roofing accessories in Galvanised, Cromadek, Colorplus, Zincalume, Colorbond, Mild Steel, Aluminium and all Grades of Stainless Steel. Our products are manufactured in standard lengths of 3 metres, but special lengths are available on request. Steel Kitchen Units:
Flashex Steel Kitchens (FSK) manufactures all steel kitchen units with a steel carca
ss and wood grain or steel doors. We use all grades of Stainless Steel, Epoxy Coated Mild Steel and Aluminium. We also do our own Epoxy Powder Coating on all our products with our very own plant. Delivery offered within Gauteng area depending on the size of the order
Floor units range in sizes from single door units (300 mm in width), to four-door units (1800 mm in width). Sink units are available with the bowl on the left or right hand side or with two bowls. Sliding or hinged doors may be chosen, and widths range from 900 to 1800 mm. Wall units range in width from 900 to 1800 mm (sliding doors) or from 450 to 1800 mm (hinged doors). The broom and grocery cupboards are made in two widths: 450 and 900 mm. The oven unit measures 770 mm in width by 1935 mm in height. Low cost kitchens are available for the RDP market. Powdercoating:
Flashex Powder Coating use only the best products available to us when we do our powder coating. Our team has years of experience in powder coating products and take every care to assure high quality and standards. We do the coatings for interior as well as exterior goods depending on your specifications. There are textured or smooth finishes available in many and varied colours to suit different and varied requirements. The products are chemically washed and treated to removes all oil, grease, grime and dirt and ensure rust protection. The next step is the powder coating itself which is done with our semi-automated plant using a conveyer system and spray booths. After coating the products they go into a 16 meter gas operated oven and cures for around 20 minutes at a temperature of 200 degrees Celsius. Cool down takes a further 10 to 15 minutes before goods are completed and ready for packaging and shipment or if further work is to be done before shipment, we send all goods to our assembly line. PLEASE VISIT OUR WEB SITE FOR MORE INFORMATION AND PICTURES