20/02/2024
Kgalagadi - about as remote as a site can get, this was atop the tallest sand dune in a dune field approaching the border of Botswana, Namibia and South Africa, accessible only by 4x4 vehicle.
The client is building a large Villa which required working loads of around 400kN per pile.
The 118mm diameter, 7.5mm thick Ductile Iron Piles were driven to refusal around 21m from working platform level.
There were approximately 50 no. piles required, which were completed in 8 working days. All piles were tied together with a bi-axially braced ground beam.