Normand Energy Switchgear Repairs successfully completed!
Solstad Offshore's Normand Energy was brought into Cape Town Port for scheduled 5-year maintenance and our switchgear team was able to attend to one of the many scopes on board.
During our switchgear maintenance this year we found that the existing spare circuit breaker had damaged connection points, and the racking cradle had been warped. The team was able to conduct an assembly of new breaker to meet the clients’ requests.
This included:
- The circuit breaker relay was programmed to fit the protection functions requited by the load.
- The old racking mechanism was removed.
- The cubicle was adjusted, and the new racking mechanism was aligned with the panel and bus bars.
- The new installation allowed the circuit breaker to rack in and out correctly.
Utilizing our advanced OMICRON electronics testing equipment, SATS were conducted and compared to FATS results to ensure correct operation.