PERI PERI is one of the leading manufacturers and suppliers of formwork and scaffold systems in the world. And that is what makes us strong.

Sky-high monuments in Asia, highly efficient industrial plants in Europe or school buildings in Africa – the world is our construction site. With a turnover of € 1,862 million in 2025, PERI is one of the largest manufacturers and suppliers of formwork and scaffolding systems. With around 10.000 employees and over 140 warehouse locations in more than 60 countries, the family-owned company with head

quarters in Weissenhorn (Germany) serves its customers with innovative system equipment and comprehensive services relating to all aspects of formwork and scaffolding technology. Since Artur and Christl Schwörer founded PERI in 1969 in Weissenhorn, the company has remained in the family. We are independent and maintain our unmistakable PERI spirit. Our success story is based on a simple but powerful philosophy: We always have the benefit of our customers in mind. We therefore offer contractors and scaffolding companies a variety of sustainable and innovative products to ensure they get the solution they've been looking for. What makes PERI so special? Most of our systems can be easily combined which saves time and money. Our core competencies:
- Formwork solutions
- Scaffolding solutions
- Civil engineering solutions
- Industrial scaffolding
- A wide range of panels & components
- Software & apps
- 3D construction printing

With our solutions, we drive forward the digitalisation of the construction industry and make construction work more economical, faster, and safer.

How do you build a 95 metre skyscraper when space on site is extremely limited? 🏙️🚇At Central Point in Warsaw, building ...
17/06/2026

How do you build a 95 metre skyscraper when space on site is extremely limited? 🏙️🚇

At Central Point in Warsaw, building directly above two metro lines required precise coordination and efficient workflows from day one. To support the crew under these confined site conditions, TRIO panel formwork became part of the setup. 👷‍♂️⏱️

With minimal components, rail guided screens and just in time deliveries, the project team maintained safe and consistent progress throughout the construction phase. 🏗️

🚧 One move at a time. One pour closer to the finish.While traffic keeps flowing below, every step on site has to land pe...
14/06/2026

🚧 One move at a time. One pour closer to the finish.

While traffic keeps flowing below, every step on site has to land perfectly above it. From positioning the formwork to coordinating each move on site, this is construction rhythm in action. 🌉 Got a site moment that captures the vibe? Tag us or drop it in the comments 👇

GOAAAL! ⚽️ We are kicking off a   to our massive World Cup project.As the 2026 fever kicks off, we are throwing it back ...
11/06/2026

GOAAAL! ⚽️ We are kicking off a to our massive World Cup project.

As the 2026 fever kicks off, we are throwing it back to Doha 2022. To connect five major stadiums on time, we teamed up with Hyundai E&C to build over 10 km of complex bridges.

We hit the top corner by introducing specialised heavy-duty shoring towers to the Middle East for the very first time. These handled massive loads while city traffic kept moving right underneath us. Also, by using 3D digital planning, we were able to simulate every move to beat a razor-sharp schedule. Today, these bridges carry 20,000 vehicles per hour. It is a legacy that lasts long after the final whistle.

⚽ Who are you cheering for this year? Drop your favourite team below! 👇

At the E18 extension in Norway, tight spaces and heavy loads were a real challenge for the schedule. We supported the si...
04/06/2026

At the E18 extension in Norway, tight spaces and heavy loads were a real challenge for the schedule. We supported the site team with a fully customised formwork solution to keep things moving. 🛠️ The clue? A system that was assembled directly inside the tunnel. Then moving entire units effortlessly using standard wheel loaders. 🚜 This setup allowed the team to maintain continuous 10 metre concreting cycles seamlessly. 🔄

And we delivered fast. From initial planning to final delivery it took just 11 weeks. That is how smart support keeps your timeline and budget on track. 🚇

What is your top priority for keeping tunnelling projects on schedule? Let us know below. 👇

Unique history calls for unique scaffolding 🏗️For the renovation of a historic industrial landmark at a UNESCO World Her...
03/06/2026

Unique history calls for unique scaffolding 🏗️

For the renovation of a historic industrial landmark at a UNESCO World Heritage site in Germany, the challenge was clear: create a stable working platform above active railway tracks and pedestrian routes without ground support. 🚧

A customised bridge solution with lattice trusses spanning up to 26.5 metres made exactly that possible.
Pre-assembled on the ground and lifted into place within half a day, the solution also saved around 9,000 cubic metres of scaffolding material compared to traditional methods.

Because restoring the past sometimes means building in completely new ways. 🚀

  to a tunnel project where standard solutions reached their limits. 🚇Deep underground in London tight spaces, complex g...
28/05/2026

to a tunnel project where standard solutions reached their limits. 🚇

Deep underground in London tight spaces, complex geometries and demanding sequences required more than simple components. ⚙️ Together with KERN Tunneltechnik, we developed a tailored system combining specialist engineering, customised machines and formwork – fully integrated into the tunnelling process. The result? A controlled, efficient workflow that keeps construction moving safely, even below the surface. 😎🏗️

Complex geometry? Handled. 🏗️With the right wall formwork system, every challenge finds its form. At PERI, we help to tu...
24/05/2026

Complex geometry? Handled. 🏗️
With the right wall formwork system, every challenge finds its form. At PERI, we help to turn complexity into clarity.

💛 Double tap if this is your daily view.
📸 Got a similar site view? Share it with us and send it per DM.

At the Harbiye Congress Center in   🇹🇷, the schedule was relentless.To keep the project moving, the team turned to our T...
21/05/2026

At the Harbiye Congress Center in 🇹🇷, the schedule was relentless.To keep the project moving, the team turned to our TRIO panel formwork: a system engineered for pure .

Why TRIO? Because it simplifies the complex:
✅ Rapid assembly
✅ Easy handling
✅ Seamless integration with our shoring towers

From the foundations to the slabs, our systems make sure that speed and precision work hand-in-hand. With TRIO, you don't have to choose – it comes in three.

When engineering makes a grand entrance... it's time to roll out the red carpet! 🕺✨The 1.4km Nordhavn Tunnel is a Copenh...
19/05/2026

When engineering makes a grand entrance... it's time to roll out the red carpet! 🕺✨

The 1.4km Nordhavn Tunnel is a Copenhagen masterpiece, linking the city centre to the north to transform urban travel. To master this mammoth cut-and-cover project, 8 of our VTC Tunnel Formwork Carriages are delivering precision across 54 sections.
When engineering runs this smoothly and safely, it deserves the VIP treatment! 🏗️🎬

Want an exclusive backstage pass?

👉 Get the full insights via the link in comments!

On final approach to structural precision. ✈️At the AirportAcademy at Munich Airport, what you see is more than a striki...
17/05/2026

On final approach to structural precision. ✈️

At the AirportAcademy at Munich Airport, what you see is more than a striking façade. The X-shaped elements don't just define the design – they carry loads, stabilise the structure, and reflect the runway geometry of the airport itself.

Translating this complex geometry into a buildable concrete solution across 15,000 m² required careful planning and precise ex*****on. That's where we supported the project: with 89 tailored, custom-made formwork units designed to handle the intricate structure with accuracy on site. 📐

The result: high-quality exposed concrete and a smooth construction process. Engineering excellence in every X. 😎

Adresse

Weißenhorn

Öffnungszeiten

Montag 09:00 - 16:00
Dienstag 09:00 - 16:00
Mittwoch 09:00 - 16:00
Donnerstag 09:00 - 16:00
Freitag 09:00 - 16:00

Benachrichtigungen

Lassen Sie sich von uns eine E-Mail senden und seien Sie der erste der Neuigkeiten und Aktionen von PERI erfährt. Ihre E-Mail-Adresse wird nicht für andere Zwecke verwendet und Sie können sich jederzeit abmelden.

Service Kontaktieren

Nachricht an PERI senden:

Teilen

Kategorie