03/21/2025
Freeman Boatworks friday. Very happy with how this job turned out. It was a challenge to say the least. All who helped I cannot thank enough. Tidewater Composites LLC did an excellent job of making a giant hole in the hardtop look completely factory. Charlton’s Marine Canvas for making one wild set of cushions and making another one of my wild ideas come to life. It was challenging to get the tower to flow with the existing structure without any ability to fabricate on the boat itself. Everything was painted in lieu of Powdercoat. Removable buggy top. Main structure unbolts and sits perfectly in the bow for easy transport. An intermediate harness/plug system was built for all electrical and rigging to allow simple dismantling and transport. Cannot wait to share sea trial and in water pics of this incredible boat!