10/07/2026
Most plants have a short list of projects that can only happen when the line stops. A crane runway that needs extending. A hoist that's due for replacement. A conveyor section that has to move before the new layout works.
If your plant shuts down over the holidays, that window is about ten weeks away, and our field and engineering teams have room on the schedule for it. Planning now means steel, components and crews are lined up before the line stops, so the work fits the window and you start back up on time.
Crane modifications and relocations, conveyor installs, mezzanines, rigging and machinery moves, controls changes. Walk it with us now and we'll scope it, plan it and have everything ready for your shutdown.
Message your S&K territory manager or call 859.293.0000.