Systecon

Systecon Systecon is a leading manufacturer of modular utility solutions.

Providing the most efficient & advanced solutions for our customers' projects – custom designed, factory assembled, performance tested & delivered to the work site ready for installation.

On the production floor: A central chiller plant for a state government training facility in Austin, TX, supporting poli...
05/29/2026

On the production floor: A central chiller plant for a state government training facility in Austin, TX, supporting police, state troopers, and SWAT.

Current capacity includes three 730 ton chillers, with expansion planned for two additional units. Key equipment features Trane chillers, Grundfos pumps, and Allen-Bradley controls.

Project partners: Texas AirSystems, Flintco, Waterloo MEP Engineering

Phase 3 of a 1,650 ton   chiller plant is underway. Systecon also delivered Phases 1 and 2 for this long time data cente...
05/13/2026

Phase 3 of a 1,650 ton chiller plant is underway. Systecon also delivered Phases 1 and 2 for this long time data center client, and we value the continued collaboration.

Key components include: Daikin Applied Americas chiller, Baltimore Aircoil Company cooling tower, Patterson Pump Company pumps, and Danfoss Sondex heat exchanger.

Systecon's Sales Representative Training Program is held twice a year and supports our rep network at all experience lev...
04/30/2026

Systecon's Sales Representative Training Program is held twice a year and supports our rep network at all experience levels. We recently wrapped up our latest session, which featured an immersive experience with collaborative discussions, along with a tour of our manufacturing facility. The factory tour is consistently one of the most valued and well received parts of the program.

Thank you to everyone who participated. We appreciate your time and engagement!

Systecon is supporting a new Cathode Manufacturing Facility in the South with a 4,020 ton Modular Chilled Water Central ...
04/10/2026

Systecon is supporting a new Cathode Manufacturing Facility in the South with a 4,020 ton Modular Chilled Water Central Plant.

Systecon’s approach supports fast track delivery through a parallel construction path. Factory fabrication and testing ensures system performance prior to delivery while avoiding weather related delays. Off site manufacturing also improves overall construction safety, and the plant meets ETL equipment listing requirements.

System components include:
• Chillers & cooling towers
• Structural platform
• Primary/secondary pumping
• VFDs
• Hydronic specialties
• Allen Bradley controls
• Full equipment enclosure

Project partners: Mechanical Resource Group, Echo Power, Conti LLC

Progress continues on a   boiler skid for a college campus, expanding the capacity of their existing Systecon modular pl...
03/20/2026

Progress continues on a boiler skid for a college campus, expanding the capacity of their existing Systecon modular plant.

Project partner: Air Treatment Corporation

Progress Photos: High-Pressure Steam to Hot Water Conversion PlantThis Systecon   plant will support system renovations ...
02/27/2026

Progress Photos: High-Pressure Steam to Hot Water Conversion Plant

This Systecon plant will support system renovations at Georgetown University, providing hot water to dorms and other campus buildings throughout the multi-year, multi-phase project.

With a very limited site footprint, a high visibility campus location requiring minimal disruption, and the option for future relocations as the project progresses, modular was the clear choice for flexibility and efficiency.

System Performance & Key Components:
• 25,000 lb/hr @ 125 PSI steam to 2,540 GPM @ 200°F hot water supply
• (3) Shell & tube heat exchangers
• (3) 75 HP Hot water pumps (variable primary)
• High pressure steam headers with associated valving
• Condensate cooler
• Enclosure

Project & Vendor Partners: Georgetown University, Engenium Group, FVB ENERGY (EOR), Xylem/Bell and Gossett, Hexonic, ABB.

Shown here is a   chilled water pump package for an Upper Midwest dairy facility. The roof-top system has 700 tons of co...
02/10/2026

Shown here is a chilled water pump package for an Upper Midwest dairy facility. The roof-top system has 700 tons of cooling at 2,500 GPM.

Why Modular?
• Fast‑track delivery through parallel construction path
• Factory testing to ensure quality and performance
• Weather‑proof progress thanks to controlled indoor assembly

Key components include:
• Pumps
• Variable Frequency Drives
• 3000-Gallon Buffer Tank
• Hydronic Specialties
• Allen Bradley Controls
• Equipment Enclosure

Project Partners: Masters Building Solutions, Excel Engineering

On the production floor: We’re moving forward with a modular boiler skid project for a college campus, expanding the cap...
01/23/2026

On the production floor: We’re moving forward with a modular boiler skid project for a college campus, expanding the capacity of their existing Systecon plant. We’re glad to support educational institutions with scalable, high performance systems and appreciate the continued trust from this repeat customer.

Project partner: Air Treatment Corporation

Progress continues on Phase 2 of this Systecon modular chiller plant. Built for a long-time data center customer, the 15...
01/09/2026

Progress continues on Phase 2 of this Systecon modular chiller plant. Built for a long-time data center customer, the 1525-ton plant is for a site outside of Denver, CO, and integrates a Daikin Applied chiller, Baltimore Aircoil Company tower, Patterson Pump Company pumps, and Danfosss Sondex heat exchanger.

Warm wishes for a Happy New Year!
12/31/2025

Warm wishes for a Happy New Year!

Address

6121 Schumacher Park Drive
West Chester, OH
45069

Alerts

Be the first to know and let us send you an email when Systecon posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share