Power Systems Design Group

Power Systems Design Group Northern Californiaโ€™s Premier Dry Utility Consulting & Engineering Design Firm

Forty years in this industry teaches you where projects actually stall.It is rarely the field. It is the approval proces...
06/18/2026

Forty years in this industry teaches you where projects actually stall.

It is rarely the field. It is the approval process. A single unreturned comment or an inaccurate layout can push a schedule back by months.

Navigating Northern California's utility requirements takes experience, attention, and a team that stays ahead of agency reviews. That is why developers, civil engineers, and general contractors choose PSD. We handle the friction behind the scenes so your teams stay focused on building.

๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-8485 | [email protected]
Panaskopic Productions LLC

The quality of a finished residential street reflects decisions made months before it existed.Utility stub locations, se...
06/15/2026

The quality of a finished residential street reflects decisions made months before it existed.

Utility stub locations, service routing, street lighting circuits, and joint trench coordination all had to be resolved in design and cleared through agency review before a single lot was ready for framing. When that process is managed well, the result is a block like this: complete, functional, and ready to hand off without outstanding utility issues.

For developers, that outcome is not just visual. It protects occupancy timelines, reduces closeout risk, and keeps the next phase moving without delays carried over from the last one.

Forty years of residential utility work in Northern California means PSD knows exactly what it takes to deliver this result at scale, phase after phase.

๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-8485 | [email protected]
Photo by Panaskopic Productions LLC

Return business is not given. It is earned.Building long-term relationships with owners, contractors, and local agencies...
06/12/2026

Return business is not given. It is earned.

Building long-term relationships with owners, contractors, and local agencies means showing up with consistent accuracy, clear communication, and a genuine understanding of how approvals affect construction schedules.

We are grateful for the continued trust of Preston Companies and the general contractors across the Bay Area who make PSD their go-to dry utility designer. That kind of partnership is what we work for every day.

๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-8485 | [email protected]
Panaskopic Productions LLC

One aerial frame. Multiple active phases. Years of dry utility coordination behind it.This is River Islands in Californi...
06/10/2026

One aerial frame. Multiple active phases. Years of dry utility coordination behind it.

This is River Islands in California; residential communities built and occupied, a waterfront neighborhood established, and a school campus currently under construction. Each phase carried its own utility requirements, agency approvals, and design documentation that had to stay ahead of construction activity without holding it up.

Managing dry utility design across a development of this scale means staying organized across overlapping timelines, multiple utility providers, and constantly shifting site conditions. It is not a one-project engagement. It is an ongoing operational partnership.

๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-8485 | [email protected]
Photos by Panaskopic Productions LLC

Forty years is built one project at a time.River Islands is one of Northern California's most ambitious master-planned d...
06/08/2026

Forty years is built one project at a time.

River Islands is one of Northern California's most ambitious master-planned developments. Staying on as dry utility design lead from the beginning takes more than technical knowledge. It takes accountability, consistent communication, and a team that treats the developer's timeline as their own.

We are proud of what we have built alongside the River Islands team. And we are looking forward to what comes next.

๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-8485 | [email protected]
Photos by Panaskopic Productions LLC
Adam Vawter

Early-stage site work is where dry utility decisions have the most impact.Staged conduit, active grading, and open trenc...
06/05/2026

Early-stage site work is where dry utility decisions have the most impact.

Staged conduit, active grading, and open trenches are visible here. What is not visible is the upstream coordination that makes this moment run without interruption: utility routing decisions, agency submittals, conflict resolution, and design documentation aligned with civil plans before any equipment hit the ground.

For developers and project managers working in Northern California, the approval process is where schedules are most at risk. Engaging dry utility engineering early is not a preference. It is a schedule protection strategy.

๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-8485 | [email protected]

Adam Vawter
๐Ÿ“ธ Panaskopic Productions LLC

Behind the Design.A lot of our work happens before anything reaches the field, in the layers of coordination, modeling, ...
05/29/2026

Behind the Design.
A lot of our work happens before anything reaches the field, in the layers of coordination, modeling, and design development that help move a project forward. Typical days often mean moving between plans, system layouts, and problem-solving conversations, working through details that may never be visible but shape everything that follows. This is the side of the work where precision is built quietly, one decision at a time.
Adam Vawter
๐Ÿ“ธ Panaskopic Productions

A Typical Day at Work.Some days move between plans, field conditions, utility equipment, and back again. A lot of our wo...
05/25/2026

A Typical Day at Work.
Some days move between plans, field conditions, utility equipment, and back again. A lot of our work lives in that constant connection, reviewing what is on paper, checking what exists in the field, and working through the coordination in between. It may look like a collection of ordinary moments, but this is often where the real problem-solving happens and where progress quietly starts taking shape.

A lot of our work happens long before activity reaches the field, and moments like this reflect that side of the process...
05/22/2026

A lot of our work happens long before activity reaches the field, and moments like this reflect that side of the process. Coordination often starts with planning, mapping, and working through how utility systems relate to the larger development before decisions are carried forward. This kind of overview may look straightforward, but it represents the structured thinking behind how we help bring clarity to complex infrastructure needs through design, coordination, and specification.
๐Ÿ“ธ

Residential. Commercial. Academics. All of it needs utility infrastructure designed and coordinated before construction ...
05/20/2026

Residential. Commercial. Academics. All of it needs utility infrastructure designed and coordinated before construction begins.
River Islands is one of California's most complex active master-planned communities, and PSD Group has been the dry utility design lead across residential, commercial, academic, and mixed-use phases since the beginning.
Still building. Still coordinating. Still on schedule.
๐Ÿ”— powersystemsdesign.net | ๐Ÿ“ž (925) 933-848
๐Ÿ“ธ

Address

1853 Bonanza Street
Walnut Creek, CA
94596

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm
Saturday 8am - 5pm

Telephone

+19257656298

Alerts

Be the first to know and let us send you an email when Power Systems Design Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Power Systems Design Group:

Share