Part 2: the rough build.
Drawings become steel. Stringers cut to length, treads laid out, and every piece fit, squared, and tacked on the table before a full weld goes down. Measure twice, fit it tight, check it again.
Nothing leaves our shop until it's dead on.
Part 3 on Wednesday: install day.