04/29/2026
4,000 amps doesn't come offline by accident.
JT and the Ace field team are in the middle of a full main switchgear changeout - the kind of project where planning, sequencing, and ex*****on have to be exact. One missed step on a job this size turns a scheduled outage into a much bigger problem.
This is the work that keeps Central Valley facilities running long after the project wraps.
New gear, properly installed and tested, means safer operations, fewer surprise failures, and a power distribution backbone built to hold up tor years.
If your facility is staring down aging switchgear or planning a power upgrade, our field service team can help you scope it, schedule it, and get it done right.