PROJECT LOOK-BACK | Oddie Boulevard – Wells Avenue
Silver Strike Concrete supplied approximately 15,000 cubic yards of ready mix concrete for the Oddie Boulevard – Wells Avenue Multimodal Improvements Project, working alongside Granite Construction on the transformation of roughly 3.2 miles of this heavily traveled corridor.
The finished project included new roadway, raised concrete medians, continuous sidewalks, a 10-foot shared-use path, raised cycle track and other improvements designed to create safer, more accessible connections throughout Reno and Sparks. It was later recognized as the 2024 Transportation Project of the Year by the ASCE Truckee Meadows Branch.
See the full featured project details: https://silverstrikeconcrete.com/2026/09/17/oddie-boulevard-wells-avenue-multimodal-improvements-project/