10/23/2026
When one integrity test raised questions near the top of some drilled shafts, a second test helped put them in context.
On the Raritan River Bridge replacement in Perth Amboy, NJ, our engineers spent three years testing the foundations for a new bridge replacing a 1908 swing span, including 140 drilled shafts up to 8.5 feet in diameter. The full case study shows what each test found.
🔗 Read the case study:
GRL Engineers provided pile driving monitoring, integrity testing services, CAPWAP Analyses and other testing services on the Raritan River Bridge replacement.