45 Fabrication

45 Fabrication Small repairs to large fabrication work, mobile welding

-17+ years of experience 856-448-5199

Coming into 2026 strong, we added plate rolling services to our roster. 48x1/4” steel capacity. 
01/16/2026

Coming into 2026 strong, we added plate rolling services to our roster. 48x1/4” steel capacity. 

04/29/2025

Our dad, Craig Dilliplane Sr., was recently diagnosed with stage 3 lung cancer—and our world has been turned upside down. This has been an incredibly difficult and emotional time for our family, but we’re rallying around him with all the love and strength we can offer.

We’re holding a benefit on June 1st to help with the overwhelming medical bills, transportation to treatments, and everything else this fight demands. It’s more than just a fundraiser—it’s a celebration of the love and strength that surrounds him.

If you can’t make it but still want to help, donations can be made via Venmo: (https://venmo.com/CraigDilliplane)
Or email [email protected] for other ways to contribute.

If you’ve ever had the joy of meeting our dad, you know how deeply he deserves to feel the love he’s given so freely to others. Thank you for being part of this fight with him—we feel it, and we are so grateful.

12/10/2024

Here’s a functioning video to follow the last post

We’re so over due for a post I figured this would be a good one to share… This is an air dam/handler assembly that ate a...
12/10/2024

We’re so over due for a post I figured this would be a good one to share…

This is an air dam/handler assembly that ate a blade and the customer brought it to us hoping we could break the manufacturers ETA of a new unit (apparently they don’t sell replacement parts)

Anyway we assessed the situation, degreased and pressure washed the unit, fabricated a form punch and press broke/formed a new blade. Completely disassembled the unit, replaced every piece of hardware from the inside out and reassembled.

Manufacture said 3 months for a new unit, we did it in 3 days. Ready to go back in service.

Customer brought in a very hard to find inner primary that was basically beyond fixing. Between the broken parts, stripp...
08/22/2024

Customer brought in a very hard to find inner primary that was basically beyond fixing. Between the broken parts, stripped/egged bolt holes we started searching for a replacement.

Thanks to Joseph DePaola and Nick at Nicks cycles in Williamstown we found one that was in great shape minus one crack.

All fixed up now, and the customer can put his bike back together.

New rig out here staying busy, I’ll try to update some of the shop work content eventually
08/16/2024

New rig out here staying busy, I’ll try to update some of the shop work content eventually

New rig is here, stay tuned! It’s still gotta go see Dynamic TINT & Paint Protection and Sticky Situation Wraps
07/13/2024

New rig is here, stay tuned! It’s still gotta go see Dynamic TINT & Paint Protection and Sticky Situation Wraps

Actually remembered to take step by step photos of a challenging project. That’s another one saved from the scrap pile t...
03/29/2024

Actually remembered to take step by step photos of a challenging project. That’s another one saved from the scrap pile though!

2 sets of our tree kickers installed tonight and an oil change on the black machine.  Powder coating done by Nick Gottsc...
02/17/2024

2 sets of our tree kickers installed tonight and an oil change on the black machine.

Powder coating done by Nick Gottschling at SSG powder coating.

Recently added a skat blast cabinet to our inventory of equipment. Helps out big time with material and parts prep work ...
02/14/2024

Recently added a skat blast cabinet to our inventory of equipment. Helps out big time with material and parts prep work for welding and painting.

Last photo is a set of HCR long travel arms for our personal YXZ build, blasted then painted with sliver Steel-It.

Some stainless parts fresh off the press brake for Forgotten Hot Rods, LLC
02/14/2024

Some stainless parts fresh off the press brake for Forgotten Hot Rods, LLC

YXZ chassis/cage updates (on going personal project)
02/14/2024

YXZ chassis/cage updates (on going personal project)

Address

Sicklerville, NJ
08081

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 9pm
Saturday 9am - 3pm

Telephone

(856)4485199

Alerts

Be the first to know and let us send you an email when 45 Fabrication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to 45 Fabrication:

Share