02/23/2026
Proud to partner with Nasseff Mechanical Contractors on a highly coordinated mechanical placement at a local school in Saint Paul.
• 22 engineered lifts completed in one day from two crane locations, each with custom rigging plans.
• Pre-scanned and fully engineered site, executing the work without removing any overhead obstructions.
• Utilized our in-house designed 35’ cantilever beam with a 10’ extension to reach 25’ into the building.
From planning to ex*****on, this project reflects the precision and reliability our clients count on.
If your next project demands proven results, our team is ready.