09/30/2026
As part of the $250 million Hampton Park redevelopment in Capitol Heights, Maryland, Romtec Utilities provided a high-capacity stormwater pump station designed to protect this mixed-use development from flooding and stormwater impacts.
The 25-acre redevelopment is transforming a former retail site into a vibrant destination featuring residential housing, retail, hospitality, and community services. To support the site's long-term success, Romtec Utilities designed and supplied a stormwater pumping system capable of handling nearly 11,000 GPM during peak flow conditions.
Key features include:
Triplex Keen 25 HP pumps
12-foot diameter wet well
Ductile iron piping and Tideflex® check valves
Stainless steel components for durability and reliability
Complete design, manufacturing, and startup support
By partnering with engineers, contractors, and developers, Romtec Utilities helps deliver resilient stormwater infrastructure that protects people, property, and investments while supporting sustainable community growth.
Read more: https://na2.hubs.ly/H07C_470