09/27/2026
Second seat installed this morning so I can knock out the valve job tomorrow and finish up another set of Gen2 M8 heads.
When they interlock it takes twice as much time, leaving 1 old seat in, machine the first one, then after they stabilize and cool you can machine the second one, 2 day project for me.
+4’s back at the track soon.
I’m ready to finish these up and get back to a 88” Sportster top end for a Midwest racer.