06/03/2026
The majority of the dig is done, just a little cleanup and bring the pad to finish grade. The trench will be inspected Friday and we should start building the wall on Monday. Oh and figure out what to do with the last of the dirt. Approximately 200 yards left to tuck away somewhere.