Fass Fab

Directions Contact the business

Fass Fab Custom metal fabrication.

Forgot to post these before I left for work.  Both sides cut out, sanded to bare metal and ready for tube work and skinn...
10/21/2026

Forgot to post these before I left for work. Both sides cut out, sanded to bare metal and ready for tube work and skinning. Upon return is to get the rear tube skeleton and door done to get the entire frame and body off the jig and onto the BDS suspension. Brad Steed

Mocking up and setting passenger floor feet height and seat height. Brad Steed
10/12/2026

Mocking up and setting passenger floor feet height and seat height. Brad Steed

Inside panels cut out.  Now to take everything to bare metal, repair lower quarters on the rear and start building the f...
10/05/2026

Inside panels cut out. Now to take everything to bare metal, repair lower quarters on the rear and start building the floor and interior panels. Brad Steed

Cut out the rest of the inside tub of the body.  Now to progress onto working on the rear portion of the subfloor and bo...
09/25/2026

Cut out the rest of the inside tub of the body. Now to progress onto working on the rear portion of the subfloor and body mounts. Brad Steed

After having to reconfigure a different location and better mount finally finished with steering column mount!  Had many...
09/23/2026

After having to reconfigure a different location and better mount finally finished with steering column mount! Had many pieces to piece together, redesign and get a new mount it’s at a much better angle and flows better. Now onto rear floor removal and new bracing. Brad Steed

Chasing down this steering.  Trying to make sure it’s located in the correct spot for Brad Steed while it’s centered and...
09/14/2026

Chasing down this steering. Trying to make sure it’s located in the correct spot for Brad Steed while it’s centered and 0 angle. Had to come up with my own little measuring tool. IH Scout /

Headers in for setting up steering.  Brad Steed
09/14/2026

Headers in for setting up steering. Brad Steed

Engine back in and time to set the pedals, floor, seats and work towards the back.  Brad Steed
09/10/2026

Engine back in and time to set the pedals, floor, seats and work towards the back. Brad Steed

Steering column tacked in.  Minor adjustments left before welding and metal finishing.  Then onto designing, cutting and...
09/01/2026

Steering column tacked in. Minor adjustments left before welding and metal finishing. Then onto designing, cutting and mounting the pedal assembly. Brad Steed

Steering column mocked up.  Playing with idea to print a spacer that is removable for serviceability.  Need to cut some ...
08/25/2026

Steering column mocked up. Playing with idea to print a spacer that is removable for serviceability. Need to cut some drop down and firewall mounts and solid mount the column. Brad Steed

Address

Platte City, MO
64079

Website

Alerts

Be the first to know and let us send you an email when Fass Fab posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fass Fab:

Shortcuts

Share