Fuller Fabrication

Fuller Fabrication Fuller Fabrication is a small and new business that is starting up in the welding and fabrication in It doesn't hurt to ask and see what we can do for you.

We are a small fabrication shop that can do anything from mobile repair work, reinforcements, railings and structural steel to trailers, trucks and plows you name it.

Holden Industrial Park located in Holden, MA this project was completed this September 2025. Multiple 304 Stainless stee...
11/08/2025

Holden Industrial Park located in Holden, MA this project was completed this September 2025. Multiple 304 Stainless steel railings with a smooth brushed grain finish and uniform TIG welds. Simple and beautiful smooth railing to elevate this newly updated park for the community.

Green Hill Park located in Worcester, MA and completed this April 2025. 304 Stainless steel railings with a smooth brush...
11/08/2025

Green Hill Park located in Worcester, MA and completed this April 2025. 304 Stainless steel railings with a smooth brushed grain finish and uniform TIG welds. This project showcases the variety of our capabilities with multiple sets of galvanized swing gates, bollards, and the aluminum frame work for the park's sign. Truly grateful to be a partner and provide so many services at this incredible park.

Gardner Park located in Acton, MA this project was completed March 2025. These rails are a unique design using 2"X 1" tu...
11/08/2025

Gardner Park located in Acton, MA this project was completed March 2025. These rails are a unique design using 2"X 1" tubing we formed the rails and mitered the ends to the round posts. Accurate measuring made for an easy install and a precise fitment.

Technology Park Dr located in Westford, MA this project was completed January 2025.  140 feet of guard rail to replace t...
11/08/2025

Technology Park Dr located in Westford, MA this project was completed January 2025. 140 feet of guard rail to replace the existing rusted rails, galvanized and installed local to our shop located in Westford. Always nice getting to do quality work for your own community.

Hugh R O'Donnell Elementary School Playground located in Boston, MA this project was completed December 2024. The bleach...
11/08/2025

Hugh R O'Donnell Elementary School Playground located in Boston, MA this project was completed December 2024. The bleacher guard rails were galvanized with black epoxy, panels are hung off 2.5" posts using all stainless U bolts and hardware. Core drilling 4" holes for installation and setting with hydraulic cement to complete this project.

Utility Roof Access ladder completed right down the road in our home town of Westford MA, which was installed this past ...
01/03/2025

Utility Roof Access ladder completed right down the road in our home town of Westford MA, which was installed this past November 2024. The structural supports we fabricated and installed to give a guide for the hatch installer to put in the roof hatch. then we went back and installed the ladder to complete the job.

Noble and Greenough School located in Dedham, MA this project was completed this October 2024. Two different staircase r...
12/27/2024

Noble and Greenough School located in Dedham, MA this project was completed this October 2024. Two different staircase railing designs as well as a beautiful long ADA ramp rail for there new sidewalk and ramp access for the recess field.

Simple pipe rail for Dover-Sherborn High School Located in Dover MA, was completed over the summer of 2024. Simple raili...
12/20/2024

Simple pipe rail for Dover-Sherborn High School Located in Dover MA, was completed over the summer of 2024. Simple railing done for the stairs in the field that had some of the top steps replaced. We bent the levels off out 90 degrees from the road so vehicles will still be able to get by at the school when needed.

Hadwen we are back and completed in March of 2024, this is one of our beloved parks that was done when Fuller Fabricatio...
12/13/2024

Hadwen we are back and completed in March of 2024, this is one of our beloved parks that was done when Fuller Fabrication first went full-time. Sadly in a storm one of the huge beautiful oak tree feel down and took out a good part of the walking path and it had to be closed down for quite sometime. We are so grateful that fuller fabrication got to come back out and rebuild half of it and work at this gorgeous location again where it really all started for us. Hadwen here's to hoping you out last all the storm to come!

Beals Park in Weymouth MA, this project was completed in the summer of 2024. We were lucky enough to be apart of this be...
12/06/2024

Beals Park in Weymouth MA, this project was completed in the summer of 2024. We were lucky enough to be apart of this beautiful park by fabricating and installing handrails for the four staircases; three of which were radiused to match the contour, along with 132ft of guard rail for the stone retaining wall. Install included multiple days to complete the 56 core holes that had to be drilled, then have everything plumbed and set.

Address

170 State Road
Phillipston Four Corners, MA
01331

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

978-259-5333

Alerts

Be the first to know and let us send you an email when Fuller Fabrication posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Fuller Fabrication:

Share