05/08/2026
At Acument Global Technologies, 22,000 gallons of hot oil had to be drained every time routine maintenance or repair was needed on their aging furnace-quench pump. A new Gusher Pumps' 7550 Series pump specified by our Great Lakes Pump & Supply division eliminated this time-consuming step. With the Top Pullout design option, the new Gusher vertical pump dramatically cuts service difficulty and downtime.
Read the full story: https://ruthman.co/AHCBLOG1