Quick Headers

Quick Headers Quick Headers provides innovative construction products for the Masonry structural building industry that will save substantial money and time.

Quick Headers operates a rental business with the Quick Headers masonry shoring product, and services the entire state of Utah. Quick Headers also manufactures the product for sale to rental operators and the masonry industry.

Stripping out temporary lumber usually means wrestling with crowbars, chipping green masonry, and dealing with blown-out...
09/04/2026

Stripping out temporary lumber usually means wrestling with crowbars, chipping green masonry, and dealing with blown-out joints that require hours of frustrating patch work. Not here.

At the One Call Auto project in Eagle Mountain, Utah, McQueen Masonry demonstrates how clean the transition really is when you build with steel. Quick Headers release smooth and fast without disturbing the wall, leaving behind razor-sharp edges and pristine openings every single time. Protect the integrity of your masonry, eliminate repair work, and keep your build moving forward without missing a beat.

πŸ“ Project: One Call Auto
🧱 Mason: McQueen Masonry
πŸ“ Location: Eagle Mountain, UT

Ready to eliminate crowbar damage and lock in clean openings on every job? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

At the Mesa Fire Department project in Mesa, Arizona, GNG MASONRY knocked this one clean out of the park. When the forms...
09/02/2026

At the Mesa Fire Department project in Mesa, Arizona, GNG MASONRY knocked this one clean out of the park. When the forms drop and leave behind razor-sharp, dead-square lines with zero sag, you know you are looking at true craftsmanship backed by serious steel. No warped 2x4s, no sketchy wood shoring, and zero headaches for the trades coming in behind you. Just rigid, repeatable commercial precision from top to bottom.

πŸ“ Project: Mesa Fire Department
🧱 Mason: GNG MASONRY
πŸ“ Location: Mesa, AZ

Ready to leave your next jobsite looking this clean? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

When your build calls for repeating openings across a long wall run, repeatable performance makes all the difference. At...
08/27/2026

When your build calls for repeating openings across a long wall run, repeatable performance makes all the difference. At the Spanish Fork Fire Station project in Spanish Fork, Utah, Dartco Masonry is putting the versatility of our reusable steel forms to work.

Single-use wood framing means constant measuring, cutting, and piles of scrap cluttering the slab. Quick Headers deliver identical, true-square openings every time while completely eliminating lumber waste. The result is a cleaner workspace, a safer site for your crew, and significant labor savings that protect your bottom line from the first opening to the last.

πŸ“ Project: Spanish Fork Fire Station
🧱 Mason: Dartco Masonry
πŸ“ Location: Spanish Fork, UT

Ready to lock in repeatable precision and cut out the waste? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

Traditional wood framing completely blocks off your access points until the job is done. With Quick Headers, you get unm...
08/25/2026

Traditional wood framing completely blocks off your access points until the job is done. With Quick Headers, you get unmatched jobsite flexibility. After initial cure, you can easily shift your post shores outward to open up full drive-through access while the wall continues to set.

At the Generous Auto project in Herriman, Utah, AK Masonry is putting that versatility to work. Keeping pathways open for equipment, materials, and crew movement eliminates costly bottlenecks and keeps the entire site running efficiently. That means fewer delays, smoother logistics, and continuous labor savings from start to finish.

πŸ“ Project: Generous Auto
🧱 Mason: AK Masonry
πŸ“ Location: Herriman, UT

Ready to keep your site traffic moving and protect your bottom line? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

When your masonry openings are dead-level and razor-sharp, every single downstream trade moves faster. No out-of-square ...
08/20/2026

When your masonry openings are dead-level and razor-sharp, every single downstream trade moves faster. No out-of-square framing, no uneven sags, and no wasted hours spent shimming or fixing irregular openings for the window and glazier crews coming in behind you.

At the Mesa Fire Department project in Mesa, Arizona, GNG MASONRY demonstrates how setting the standard with engineered steel headers elevates the quality of the entire build. By ditching warped wood bucks for Quick Headers, your crew locks in identical precision from the start, making you the favorite trade on every jobsite.

πŸ“ Project: Mesa Fire Department
🧱 Mason: GNG MASONRY
πŸ“ Location: Mesa, AZ

Ready to speed up every downstream trade and elevate your build quality? Call our team at 801-675-5572 or visit
quickheaders.com to get a quote today.

08/18/2026

When your floor plan calls for repeating window spans across a massive commercial build, consistency is everything. At the Heber Flex project in Heber City, Utah, is proving how clean, razor-sharp ex*****on looks from corner to corner.

Building custom wood bucks for every single opening eats up valuable labor hours and introduces variation wall after wall. Quick Headers deliver a repeatable, heavy-duty steel shoring system that guarantees every opening stays perfectly square, identical, and true to spec. Less setup time, zero lumber waste, and unmatched precision across the entire jobsite.

πŸ“ Project: Heber Flex
🧱 Mason:
πŸ“ Location: Heber City, UT

Ready to achieve flawless consistency on your next build? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

When you look across a site with massive commercial spans like the Mesa Fire Department project, total consistency is ev...
08/12/2026

When you look across a site with massive commercial spans like the Mesa Fire Department project, total consistency is everything. GNG Masonry is showing what happens when elite craftsmanship meets engineered steel support in Mesa, Arizona.

Single-use wood bucks flex, warp, and force your crew to rebuild frames for every opening, introducing variation and wasting precious labor hours. Quick Headers eliminate the guesswork. Our heavy-duty steel system is engineered to keep every opening perfectly square, course after course, delivering identical precision from one end of the wall to the other.

πŸ“ Project: Mesa Fire Department
🧱 Mason: GNG Masonry
πŸ“ Location: Mesa, AZ

Ready to lock in total consistency on every single build? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

08/09/2026

Complex blueprints. Flawless ex*****on.

When a project demands intricate angles, multi-span corners, and heavy structural tie-ins, traditional wood shoring quickly becomes a nightmare of endless measurements, custom cuts, and constant adjustments. At the Nielsen's Frozen Custard project in Clearfield, Utah, Northpoint Construction and Fred Johnson Masonry demonstrate what happens when elite craftsmanship meets the ultimate flex in commercial shoring versatility.

Instead of spending days building complicated, single-use wood bucks, the crew leveraged Quick Headers to replace complex shoring setups with seamless ease. Our modular steel system locks into place fast, providing unyielding stability across tough angles and wide spans while keeping the entire jobsite clean, safe, and moving ahead of schedule.

πŸ“ Project: Nielsen's Frozen Custard
🧱 Mason: Northpoint Construction / Fred Johnson Masonry
πŸ“ Location:Clearfield, UT

Ready to tackle your most complex blueprints with effortless precision? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

Elevation made effortless.A huge shoutout to the skilled crew at Alessi Keyes Masonry for executing incredible work on t...
08/06/2026

Elevation made effortless.

A huge shoutout to the skilled crew at Alessi Keyes Masonry for executing incredible work on the Jack H. Wilson Water Treatment project in Little Rock, Arkansas. Taking block walls up to serious heights requires skill, precision, and the right equipment to keep the jobsite moving safely.

When you are working high up on scaffolding, fighting with heavy, temporary wood bucks is the last thing your crew needs. Quick Headers deliver a simple, engineered steel system designed to handle your highest, toughest spans with ease. By providing rock-solid support that locks in fast, we help great masons focus on what they do best: laying block with total confidence.

πŸ“ Project: Jack H. Wilson Water Treatment
🧱 Mason: Alessi Keyes
πŸ“ Location: Little Rock, AR

Ready to simplify your highest, toughest spans? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

Complex builds made simple.Cantilevered openings and intricate layouts do not have to mean hours of tedious, custom wood...
08/04/2026

Complex builds made simple.

Cantilevered openings and intricate layouts do not have to mean hours of tedious, custom wood shoring. At the Nielsen's Frozen Custard project in Clearfield, Utah, Northpoint Construction and Fred Johnson Masonry are showing how easily our modular system tackles unique structural demands.

Quick Headers deliver unmatched versatility, adapting effortlessly to complex architectural plans while providing unyielding steel support. Instead of wasting time, labor, and lumber building temporary frames, your crew gets a repeatable solution that locks in fast, eliminates clutter, and keeps your wall moving forward with total precision.

πŸ“ Project: Nielsen's Frozen Custard
🧱 Mason: Northpoint Construction / Fred Johnson Masonry
πŸ“ Location: Clearfield, UT

Ready to simplify your next complex build? Call our team at 801-675-5572 or visit quickheaders.com to get a quote today.

Address

2755 Industrial Drive, Suite 2
Ogden, UT
84401

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+18016755572

Alerts

Be the first to know and let us send you an email when Quick Headers posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Quick Headers:

Share