02/20/2026
Mama C (73' Duffie) Progress Update:
The beginning phases of production always start in the skillful hands of our incredible hull carpentry team. The hull crew began with the entire build out of the cabin and fly bridge. Once complete and passed on to our fairing and paint prep team, they then began the next phase of the build by laying out the hull footprint and assembling the 73 foot hull jig. With the hull jig successfully constructed, the hull stem and stringers were then laminated and installed into place, followed by planking on all sides of the hull. This phase of the build was then concluded with the installation of the commemorative whiskey plank.