Underpinning Construction Process

The underpinning construction process is typically carried out in two main phases:

1. Design Phase
This phase includes structural evaluation of the existing building, soil investigation, and preparation of engineering plans. The purpose is to determine the appropriate underpinning method and ensure the stability of the structure during and after construction.

2. Construction Phase
This phase involves site preparation, excavation, installation of temporary supports, and concrete work. The work is performed in controlled sections to safely transfer the building load to a deeper and more stable foundation.

The underpinning process is undertaken to strengthen and stabilize the existing foundation. In addition, it allows for the creation of new usable space, such as constructing a basement beneath an existing building.

02/02/2024

Install new stucco and paint exterior

Stucco installation process Stucco paper and wire mesh installed, ready for inspection and first layer installation
11/20/2023

Stucco installation process
Stucco paper and wire mesh installed, ready for inspection and first layer installation

09/26/2022
04/09/2021
Before and after remodeling
01/18/2021

Before and after remodeling

Address

Oakland, CA
94619

Opening Hours

9am - 5pm

Website

https://anabaconstruction.com/, https://anabaconstruction.com/, https://anabaconstructio

Alerts

Be the first to know and let us send you an email when ANABA Construction INC. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share