Our Largest Light Gauge Steel Multifamily Project to Date 🏗️
What happens when you remove the concrete podium from a multifamily building?
You save months off the schedule. You eliminate hundreds of thousands in structural steel and formwork costs. And you build a fully non-combustible structure from foundation to roof.
That’s exactly what we did on our largest cold formed steel project — a 48-unit multifamily development in Brockton, MA using 100% light gauge steel framing with zero podium construction.
This week we brought together architects, developers, and general contractors to walk the project and see firsthand what CFS construction looks like at scale in Massachusetts.
Here’s what stood out:
Every wall panel was precision-fabricated at our facility and delivered ready to install — no field cutting, no waste, no weather delays holding up production.
Full IBC-compliant fire-rated assemblies throughout. UL-listed. Non-combustible. No fire-retardant treated lumber required.
The structure went up in a fraction of the time a comparable wood-frame or hybrid podium build would have taken.
Light gauge steel isn’t an alternative anymore. It’s the standard for developers who want to build faster, safer, and more cost-effectively in New England.
If you’re an architect, developer, or GC working on multifamily projects in Massachusetts, Connecticut, Rhode Island, or anywhere in New England — let’s talk. DM us or visit aacsteel.com.
🏷️