Ancora Engineering + Architecture

Call Directions Website

Ancora Engineering + Architecture Multi-disciplinary Engineering & Architectural Design Firm

It’s  , so why not start it out by coring 40-feet of solid bedrock!  And by solid…no joints 😱Gotta love going deep on ro...
02/20/2026

It’s , so why not start it out by coring 40-feet of solid bedrock! And by solid…no joints 😱

Gotta love going deep on rock cores to really start revealing its hidden beauty

12/31/2025
Here at the ICRI Metro New York awards dinner, where Surface Design Group was given the Project of the Year award for th...
06/13/2025

Here at the ICRI Metro New York awards dinner, where Surface Design Group was given the Project of the Year award for the Walker Gymnasium rehabilitation project located at Stevens Institute of Technology. The project now has the opportunity to be submitted to the National level organization for their review with ICRI - International Concrete Repair Institute.

Ancora Engineering + Architecture was recognized for our work as the Structural Engineer of Record for the extensive repairs that wrapped up earlier this year.

Kudos to all the other awardees this evening!

Pictured is Greg Moormann, PE, RA, Principal in charge, and Robert Hartley, PE, RA, our Director of Architecture, who led a lot of the construction admin and field adjustment oversight with the group.

From our Executive Team to everyone we have the joy of collaborating and working with everyday, have a wonderful Holiday...
12/25/2024

From our Executive Team to everyone we have the joy of collaborating and working with everyday, have a wonderful Holiday Season!

And cheers to a successful new year in 2025! 🥂

Fires are devastating and unpredictable, which certainly continues to be problematic today in old structures.  It’s an u...
08/03/2024

Fires are devastating and unpredictable, which certainly continues to be problematic today in old structures.

It’s an unfortunate and unplanned situation, but to mitigate and prioritize public safety is a role that our team regularly gets called upon to help.

Working closely with NYC Department of Buildings issuing an Immediate Emergency Declaration (IED) to take down the building, our office developed a make-safe game plan for the street facade, complete demolition design, and obtained approvals by the agency within 24-hours of being on site.

From there is providing full time PE hands-on oversight to direct all site operations, and continue coordination with New York City Fire Department for continued investigations.

Fornuately this is not too common of a thing, but know that Ancora’s emergency response team is ready and able when needed.

07/18/2024

As we roll into the summer months, we've transitioned into our refreshed and updated LOGO!

As a group rooted in NYC heritage, here's a little insight to what went into the update:

The wordmark draws inspiration from the typography found on early 19th-century ferry boats you might see in the NYC harbor. The Combination Mark, viewed from different perspectives, can evoke the silhouette of diagonal braces, the sun setting on 14th street, and the iconic street cone. The design's overall aesthetic and weight can be described as having the structural integrity of Brutalism with the sophistication of Art Deco.

Nothing like a casual hangout with NYC Mayor Eric Adams. A genually nice guy to talk to and the right person to run Amer...
06/28/2024

Nothing like a casual hangout with NYC Mayor Eric Adams. A genually nice guy to talk to and the right person to run America’s greatest city.

Thanks to Extell for setting up a lovely event!

Got to catch up with some old friends as well!

Ancora Engineering, PLLC

While this is no “new” news, this photo is quite fascinating on the methods utilized at the time which are still extensi...
06/26/2024

While this is no “new” news, this photo is quite fascinating on the methods utilized at the time which are still extensively used in practices today.

So what is this? Known as the Truman Reconstruction, back in 1949 to 1952 the White House underwent an entire interior gut demolition due to significant structural damages and deficiencies found throughout (old heavy timber framing that was just on its last legs). The outer shell, a stone clad and red brick masonry backup bearing wall was left to remain while temporarily braced with steel towers and horizontal walers tied thru window openings to “grab” the wall.

Very similar style to today’s masonry interior demo’s or alterations for plenty of NYC buildings.

The cellar levels were also further excavated to accommodate more subterranean rooms and passages, triggering performing underpinning along the outer masonry facade shell (you can see the jacking pockets all formed out for load transfer and settlement control).

At least the use of proper PPE has been an improvement though over time (noting the lack of hard hat on the worker operating the bull dozer).

You can check out the Wikipedia on this topic to see more!

https://en.wikipedia.org/wiki/White_House_Reconstruction

Address

49 West 27th Street, 10th Floor
New York, NY
10001

Opening Hours

Monday 8am - 6pm
Tuesday 8am - 6pm
Wednesday 8am - 6pm
Thursday 8am - 6pm
Friday 8am - 6pm

Telephone

(212) 461-1987

Alerts

Be the first to know and let us send you an email when Ancora Engineering + Architecture posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share