05/27/2026
It’s been an exceptionally wet spring, slowing progress on all exterior work. A quick visit to Salem to check on the condition of the pointing work done last fall confirmed that the mortar mixes used in the restoration performed beautifully despite everything the winter threw at it. I can now come in next month and finish pointing the final two walls. The original Portland mortar(first photo) was a primary culprit in the deterioration of these almost three hundred year old bricks. The lime mortar and brick dust mix I used to reconstruct some of the badly damaged bricks was based on ancient Roman texts and performed beautifully. After a few years, these patches will blend in with the originally material as it absorbs carbon from the atmosphere.
Thrilled to see the results and can’t wait to get back to this project and the springhouse when this damned weather cooperates!