06/09/2026
We posted on this job a few weeks ago. At that time, the job was not completed. We were still waiting on the handrails to come back from powdercoat so we could install them. These handrails were at Oneonta Job Corps at the main entrance. The original handrails had been there since the building was built in 1934. The craftsmanship that went into those handrails to last 92 years is amazing. That is the type of craftsmanship and pride that we here at Prentice & Sons Welding take, and hope it shows in every job we do, especially this one. These handrails will be in the public eye everyday. We want them to be a positive and uplifting look to the front entrance of the building.