11/18/2019
We recently designed a boiler replacement for the State Forensic Lab on Palmer Street. Construction was by Garden City Plumbing and Heating. Their two existing large boilers were replaced by four smaller modulating boilers and the system was converted from variable primary flow to primary-secondary with variable flow only on the secondary.