09/29/2026
Half of a 17-story student housing complex lost power after a major busway failure.
Matching replacement busway was located within 15 minutes.
Power was restored within approximately 20 hours.
When a facility is down, the question isn't always:
"What's the lead time?"
Sometimes it's:
"Who has the right equipment available right now?"
Read the full story:
https://tinyurl.com/364taudh
Find. Fix. Fast.