06/03/2026
On this Rilea Group development near the airport, our team performed glazing, waterproofing, and railing inspections across the residential envelope.
These three systems are often reviewed in isolation, but they meet at the same details. Where a window frame meets the wall, where a balcony slab meets a railing post, where a pool deck drains toward a scupper, those transitions are where water tends to find a path. Coordinated review across glazing, waterproofing, and railing conditions helps confirm each system performs as intended and that the connections between them hold up over time.
In a South Florida climate, that verification carries weight. Wind-driven rain, thermal movement, and steady humidity put consistent pressure on exterior wall systems and embedded railing anchors. Field inspection at the right stage is how potential water intrusion and long-term maintenance concerns get identified before occupancy rather than after.
Reach out if your team is coordinating building envelope inspections on a high-rise or mid-rise project.