05/26/2026
As data center growth surges, the strain on existing grid capacity is becoming a defining challenge for the industry. Long wait times for utility connections are no longer the exception. They are becoming the norm.
In this video, Mission Critical Group’s Drew Gravitt, Senior Director of Distributed Generation and Microgrid Sales, shares perspective on how distributed generation and microgrids are helping data center developers address the time-to-power challenge.
As demand continues to rise, the ability to deploy power infrastructure quickly will shape who can scale and who cannot.
Watch the full video:
https://hubs.li/Q04cZtnL0