Chicora Engineering & Construction PLLC

Chicora Engineering & Construction PLLC Services include but are not limited to engineering, inspection, traffic control & materials testing.

Geotechnical engineers are relied upon to perform pile driving analysis, more commonly known as a PDA. The data collecte...
09/22/2025

Geotechnical engineers are relied upon to perform pile driving analysis, more commonly known as a PDA. The data collected from these test instruments provide the contractor with a minimum criteria, insuring that each pile meets bearing.

09/18/2025

🦫πŸ’₯🧨

Every now and then explosives 🧨 πŸ’₯ are needed on a North Carolina Department of Transportation project. Here you see a wi...
09/18/2025

Every now and then explosives 🧨 πŸ’₯ are needed on a North Carolina Department of Transportation project. Here you see a wildlife biologist and a blaster who both work for the USDA successfully remove a beaver 🦫 dam that was problematic for construction of a new bridge.

Work resumes this morning, with the team installing the 12-inch ductile iron waterline within the 24-inch encasement pip...
08/01/2025

Work resumes this morning, with the team installing the 12-inch ductile iron waterline within the 24-inch encasement pipe previously bored. The contractor has secured spider clamps to the smaller pipe, ensuring a uniform annulus for the pipe-in-pipe configuration. Factory-restraint joints are used to maintain a proper seal and prevent pipe separation.

07/30/2025

Razorback Boring Inc pushing a pilot bore for a proposed 24” encasement pipe that will house a 12” ductile iron pipe for water.

This morning is a collaborative effort. Southeast Civil Contracting personnel and equipment excavated and shored a recei...
07/21/2025

This morning is a collaborative effort. Southeast Civil Contracting personnel and equipment excavated and shored a receiving pit while Razorback Boring, Inc measured and aligned their equipment to ensure an accurate bore.

Tight joints and secure fittings are necessary for the uninterrupted distribution of potable water. Here you see water l...
07/01/2025

Tight joints and secure fittings are necessary for the uninterrupted distribution of potable water. Here you see water line crews laying ductile iron pipe and securing connections such as tees and valves with megalug mechanical joint restraints.
It’s important that the inspector keeps an accurate and detailed record of what was installed and their respective locations. πŸ’§ πŸͺπŸ”§πŸ‘·πŸ»β€β™‚️

Prior to commencing any work, identifying UBO's (utilities by others) is crucial. A preferred approach is vacuum excavat...
06/05/2025

Prior to commencing any work, identifying UBO's (utilities by others) is crucial. A preferred approach is vacuum excavation utilizing air. An advantage of air excavation over hydro excavation is the ability to backfill with dry spoils, eliminating the need for slurry disposal. Here, the contractor has discovered existing gas and communications lines.
πŸ‘·πŸ½β€β™‚οΈπŸ¦ΊπŸͺ

Here, a 42” pipe is being installed as a storm drain outfall. A dissipator pad composed of large stones will be situated...
05/30/2025

Here, a 42” pipe is being installed as a storm drain outfall. A dissipator pad composed of large stones will be situated at the outlet. Due to the substantial elevation difference, step-down structures are being constructed. πŸ‘·πŸ½β€β™‚οΈπŸš§πŸ¦Ί

It’s wear orange 🍊 Wednesday for National Work Zone Awareness Week. When traveling through work zones please slow down, ...
04/23/2025

It’s wear orange 🍊 Wednesday for National Work Zone Awareness Week. When traveling through work zones please slow down, be alert, and lookout for the safety of the individuals working. πŸ¦ΊπŸ‘·πŸ½β€β™‚οΈ

Continuing education and refresher training are essential duties of a CEI inspector. Today, an Environmental Training cl...
03/14/2025

Continuing education and refresher training are essential duties of a CEI inspector. Today, an Environmental Training class was conducted; emphasizing Erosion & Sediment Control, Permits and Permit Plans, and NPDES Reports. This class resulted from a collaborative effort between the Roadside Environmental Unit, Project Development & Environmental Analysis, and the Assistant Area Construction Engineer.

Address

5290 Chicken Road
Lumberton, NC
28360

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+19105631968

Alerts

Be the first to know and let us send you an email when Chicora Engineering & Construction PLLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Chicora Engineering & Construction PLLC:

Share