Shrock Prefab was proud to play a key role in bringing this multi-story hotel project to life. Our team provided the engineering, panel design, and prefabricated wall panels to help streamline construction and keep the project moving efficiently.
Project Scope Included:
• Fabrication and delivery of approximately 10,935 linear feet of load-bearing wall panels
• Installation of 6,417 square feet of 5/8" DensElement sheathing
• Application of Pour Stop on exterior wall panels
• Complete CFS engineering and shop fabrication drawings
• Ongoing coordination with the engineer of record, architect, subcontractors, and general contractor to ensure seamless integration
From design to delivery, prefabrication allowed for precision, quality control, and accelerated timelines—demonstrating the value of building smarter through off-site construction.