10/16/2018
San Diego Project completed in 2016
Adaptive reuse of the existing central HVAC Plant into an Amenities Building. First pic is the original image.. The change was dramatic and made a huge difference to the existing office park. The last pic shows the typical entry element that was added to each lease space in the park.